Board of Directors Documents
Displaying results 1 to 16 out of 16
- 1
| Date | Title |
|---|---|
| 20/12/2012 |
ECCAS - ECCAS Institutional Capacity Building Support (PARCI-ECCAS) - Appraisal Report (846 KB) |
| 11/07/2012 | |
| 25/04/2012 | |
| 18/04/2012 |
Multinational - Congo Basin MRV Regional Project-Phase I - Appraisal Report (1.2 MB) |
| 18/04/2012 | |
| 07/07/2011 |
chad - Rural, Pastoral and Transhumance Infrastructure Project - Appraisal Report (1.1 MB) |
| 31/05/2011 | |
| 05/05/2011 |
2011-2015 - Central Africa - Regional Integration Strategy Paper (RISP) (1.7 MB) |
| 04/02/2011 | |
| 01/02/2010 | |
| 26/01/2010 | |
| 26/01/2010 |
Chad - Koumra-Sarh Road Development Project - Appraisal Report (0.9 MB) |
| 25/01/2010 |
Multinational - Congo Basin Ecosystems Conservation Support Programme (PACEBCo) - Appraisal Report (1.5 MB)
Abstract: The program aims at the conservation of the second largest tropical forest in the world and the second “green lung” of the planet, after the Amazon. The Congo Basin covers an area of over 4 000 000 km2. The Programme is expected to provide responses to the continued degradation of this forest and climate change. PACEBCo will allow for better understanding of the new carbon markets, good practices in environmental monitoring, and the introduction of the Local Development Fund (LDF). The Programme will cover a period 5 years starting from March 2009, and it is estimated at a total cost of UA 37.28 million including an ADF grant of UA 32.00 million, a contribution of UA 5.00 million from the Economic Community of Central African States (ECCAS) and UA 0.28 million from the beneficiaries living in the selected landscapes.
|
| 05/04/2008 |
Chad - National Rural Drinking Water Supply and Sanitation Programme (PNEAR) - Appraisal Report (251 KB) |
| 25/01/2008 |
2005-2009-Chad-Mid-Term Review Report on Results-Based Country Strategy Paper (RBCSP) (28 KB) |
| 06/04/2002 |
Tchad - Projet de développent rural dans la préfecture du lac - Rapports d’évaluation (4.1 MB) |
Displaying results 1 to 16 out of 16
- 1
