Environmental & Social Assessments

Search filters
Date Title
16/11/2011

DRC-CAR- Development of the Boali Electrical System and the Interconnection of the CAR-DRC Electricity Grids Project - Résumé ESMP (248 KB)

26/10/2011

RDC -Development and Asphalting of the Batshamba – Tshikapa Road Lot 2: Loange Bridge – Tshikapa, Phase 1: Loange Bridge – Lovua Bridge - Summary ESIA (354 KB)

26/10/2011

RDC - Development and Asphalting of the Batshamba – Tshikapa Road Lot 2: Loange Bridge – Tshikapa, Phase 1: Loange Bridge-Lovua Bridge - Summary ESMP (0.9 MB)

19/09/2011

RDC - Projet d’appui au développement des infrastructures rurales (PADIR) - Resumé PGES (204 KB)

18/03/2011

DRC - Programme for Preservation of Congo Basin Ecosystems - Summary ESIA (271 KB)

12/11/2010

RDC - Semi-Urban and Rural Electrification Project - ESMP Summary (226 KB)

02/06/2010

RDC - Projet d’urgence de sécurité aérienne (PUSA) - Résumé PGES (731 KB)

23/07/2007

Multinational - Tenke Fungurume Copper & Cobalt Project - ESIA Summary (0.9 MB)

23/07/2007

R D Congo - Projet d’exploitation de cuivre et de cobalt de Tenke-Fungurume - ESIA Summary (1.4 MB)

Explore what we do

Topics

Select a country

Explore our
activities