| 29/10/2012 |
Djibouti-Ethiopia-Kenya - Drought Resilience and Sustainable Livelihoods Program of Horn of Africa (DRSL-Ho A) - SESA Summary (252 KB)
|
| 10/04/2012 |
Ethiopia-Kenya - Power Systems Interconnection Project - Annexe 1 - RAP Summary (2.2 MB)
|
| 10/04/2012 |
Ethiopia-Kenya - Power Systems Interconnection Project - Annexe 2 - RAP Summary (3.7 MB)
|
| 10/04/2012 |
Ethiopia-Kenya- Power Systems Interconnection Project - ESIA Summary (1.1 MB)
|
| 02/08/2011 |
Kenya-Ethiopia - Mombasa-Nairobi-Addis Ababa Road Corridor Phase III - ESIA Summary (348 KB)
|
| 21/06/2011 |
Ethiopia - Bedele-Metu Road Upgarding - ESIA Summary (225 KB)
|
| 27/07/2010 |
Ethiopia - Electricity Transmission System Improvement Project - ESIA Summary (805 KB)
|
| 03/08/2009 |
Ethiopia - GIBE III - Hydroelectric Project - ESMP Summary (9.5 MB)
|
| 03/08/2009 |
Ethiopia - GIBE III - Hydroelectric Project - RAP Summary (9.8 MB)
|
| 03/08/2009 |
Ethiopia - GIBE III - Hydroelectric Project - ESIA Summary (20 MB)
|
| 03/08/2009 |
Ethiopia - GIBE III - Hydroelectric Project - ESIA-Additional Study (9.1 MB)
|
| 03/08/2009 |
Ethiopia - GIBE III - Sodo 400 kV Power Transmission Lines Project - ESIA Summary (0 Bytes)
|
| 03/08/2009 |
Ethiopia - GIBE III - Sodo 400 kV Power Transmission Lines Project - RAP Summary (0 Bytes)
|
| 03/08/2009 |
Ethiopia - Gibe III - Hydroelectric Project - Summary ESIA (15.4 MB)
|
| 02/04/2009 |
Ethiopia - GIBE III Hydroelectric Project - ESMP Summary (775 KB)
|
| 13/02/2009 |
Ethiopia-Kenya - Mombasa-Nairobi-Addis Ababa Road Corridor - ESIA Summary (550 KB)
|
| 19/12/2008 |
Sierra Leone - Upgrading of the Lungi-Port Loko Road - ESMP Summary (545 KB)
|
| 08/08/2008 |
Ethiopia - Gibe III Hydroelectric Power Project - ESIA Summary (1.2 MB)
|
| 08/08/2008 |
Ethiopia - GIIBE III Hydro-Power Project - RAP Summary (785 KB)
|
| 18/02/2008 |
Ghana - Derba Midroc Cement Plant Project - RAP Summary (277 KB)
|