Evaluation Reports

Search filters
Date Title
31/05/2012

Zambia - Victoria Falls-Katima Mulilo 132kv Interconnection Project - PPER (2.0 MB)

31/05/2012

Benin - Project for the Electrification of 17 Rural Centres - PPER (2.6 MB)

07/05/2012

Mozambique - Electricity II Project - PPER (325 KB)

21/11/2011

Nigeria - Economic and Power Sector Reform Programme (EPSRP) - PPER (69 KB)

02/08/2007

Mozambique - Electricity II Project - PPER (366 KB)

01/12/2006

1996-2004 - Morocco - Evaluation of Bank Assistance to the Public Utilities Sector (263 KB)

12/08/2006

1996-2004 - Ethiopia - Review of Bank Group Assistance to the Public Utility Sector (400 KB)

12/08/2006

Ethiopia - Review of Bank Group Assistance to the Public Utility Sector - Evaluation Report Summary (101 KB)

29/04/2005

1974-2002 - Egypt - Review of Bank Group Assistance to Electricity Sector (210 KB)

08/11/2004

Ethiopia - Northern Ethiopia Power Transmission Project (276 KB)

Abstract: This report is a Project Performance Evaluation Report on the Northern Ethiopia Power Transmission Project (NEPTP) located in Northern Ethiopia.
06/11/2004

Egypt - El Arish Power Project (1.3 MB)

18/12/2002

Benin-Togo - Communauté électrique du Bénin (CEB) Energy Production Dispatching and Transport Project - PPER (278 KB)

02/10/1999

Energy & Power - The Bank Experience in the Financing of Multipurpose Hydroelectic Dams Projects Sectoral Review - Presentation Note (222 KB)

Categories: Energy & Power, Transport

28/12/1998

Human and Social Development - Review of the Bank's Experience in the Financing of Dam Projects (270 KB)

Abstract: Total Bank loans to the 10 projects examined under this review amounts to UA 122.07 million, representing an average of 15.9% of the project costs. Bank financing went primarily to civil engineering (8 out of the 10 projects). It also financed electromechanical equipment in three projects as well as the training and resettlement of populations (1 project). On the whole, the implementation of the ten (10) projects was satisfactory. Six projects are considered to have performed satisfactorily as they have attained the results defined at appraisal. Three of the multi-purpose dam projects have failed to perform satisfactorily.

Categories: Energy & Power, Transport

12/09/1998

Multinational (OMVS) Manantali Dam Project (2.9 MB)

Abstract: This Project Performance Audit Report (PPAR) reviews the Arable Lands Development Programme - Phase I Project of the Government of the Republic of Botswana for which an ADB loan equivalent to UA 7.20 million and an ADF loan equivalent to UA 6.17 million (FUA 6.70 million) were approved in October 1981. Other funds were provided by the Government (UA 5.02 million) and IFAD (UA 7.16 million) bringing the planned total project cost to an equivalent of UA 25.55 million

Categories: Energy & Power, Transport

20/08/1998

CAR: M’bali Dam Project (2.8 MB)

Abstract: The present intermediate project performance audit report is on the M’BaIi darn in CAR, for which the ADF granted to the Central African Government, on 23 November 1988, the F/CEF/ELC/88/26 loan of UA 11.10 million.
06/05/1998

Energy & Power - Egypt, Morocco and Tunisia: Energy sector impact study (263 KB)

Abstract: The purpose of the study was to assess the socio-economic impact of the sixteen ADB electricity-sector interventions on the target end-user groups in the three countries. The projects, in general, have been effectively implemented and have functioned as intended. In all cases, they appear to have had positive impacts, although the general lack of preproject baseline studies does not permit these to be quantified with any precision.

Categories: Energy & Power, Transport

16/10/1997

Cameroon: Mape Dam Project (385 KB)

Abstract: This full project performance audit report focuses on the Mape dam in Cameroon, based on a study conducted in 1981 by the Cameroonian Government under its energy self-sufficiency policy. The economic and financial study as well as the project presentation note, were prepared by SONEL with the help of a foreign consulting firm.
28/05/1997

Botswana: Morupule Power Project (350 KB)

Abstract: A pre-feasibility study, whose aim was to meet the growing power demand, in medium term recommended, in March ‘1981, a master plan for the development of the Botswana electrical system up to the year 2000 and, confirming a previous pre-feasibility study, the scaled development of a complete 3 x 30 MW coal-fired power station in Morupule and the interconnection of Shashe (Northern) and Southern divisions, formerly separately operated, before further extensions. Morupule Power Project (MPP) was the first phase of a’ three-staged development aiming at installation of 90 MW in 1988, 90 MW in 1990 in order to reach 420 MW installed capacity by the year 2000.
15/05/1997

Zambia: Rehabilitation of Kafue Gorge Hydro - power Station (0.9 MB)

Abstract: Kafue Gorge Power Station (KGPS), 6 x 150 MW installed capacity represents 56 % of total power installed capacity (1600 MW) of Zambia Electricity Supply Corporation (ZESCO). It was disabled by fire on 26th March 1989 and available capacity in the country was reduced to only 700 MW. This originated losses of foreign exchange revenues from electricity sales to Zimbabwe and power outages for industrial and domestic economic activities. Zambia, formerly power exporter was obliged to import electricity from neighboring Zaire and Zimbabwe.