Projects Performance Evaluation Report
| Date | Title |
|---|---|
| 09/02/1999 |
Malawi - District Water Supply Phase II Project and Mpira-Balaka Rural Water Supply Project - PPER (388 KB) |
| 26/01/1999 |
Angola - Middle Level Staff Training Project - PPER (3.1 MB) |
| 20/01/1999 | |
| 28/12/1998 |
Senegal - Bush Fire Control and Reafforestation Project in the North Eastern Region - PPER (2.7 MB) |
| 06/12/1998 |
Zambia - Rehabilitation of the Copper Mining Industry-Phase I - PPER (2.2 MB) |
| 27/10/1998 |
Gabon - Rubber Scheme Phase I - PPER (3.5 MB) |
| 16/09/1998 |
Madagascar - Rehabilitation of the Malaimbandy-Mahabo Road (Highway 35) - PPER (3.7 MB) |
| 12/09/1998 |
Zambia: Junior Secondary Education Project (3.3 MB)
Abstract: This Project Performance Audit Report (RPM) examines the Junior Secondary Education Project in Zambia An ADF loan of UA 8.289Jmillion (Loan Number CS/Z/ED/82/6) was approved on 27 August 1982 and signed oft 29 December 1982 The loan was to finance 100% of the foreign exchange cost and 61%of the local cost, or 85% of the total cost of the project The Government of the Republic of Zambia (GRZ) was to contribute a total of UA 1.412 million. The executing agency was the Zambia Education project implementation Unit (ZEPIU) in the Ministry of Education.
|
| 12/09/1998 |
Multinational (OMVS) Manantali Dam Project (2.9 MB)
Abstract: This Project Performance Audit Report (PPAR) reviews the Arable Lands Development Programme - Phase I Project of the Government of the Republic of Botswana for which an ADB loan equivalent to UA 7.20 million and an ADF loan equivalent to UA 6.17 million (FUA 6.70 million) were approved in October 1981. Other funds were provided by the Government (UA 5.02 million) and IFAD (UA 7.16 million) bringing the planned total project cost to an equivalent of UA 25.55 million
|
| 09/09/1998 |
Ethiopia: Gore - Tepi Road Project (2.6 MB)
Abstract: This project performance audit report is concerned with the performance of the Gore-Tepi road in the south-west of Ethiopia.
|
| 01/09/1998 |
Botswana: Arable lands development Phase I (1.5 MB)
Abstract: This Project Performance Audit Report (PPAR) reviews the Arable Lands Development Programme - Phase I Project of the Government of the Republic of Botswana for which an ADB loan equivalent to UA 7.20 million and an ADF loan equivalent to UA 6.17 million (FUA 6.70 million) were approved in October 1981. Other funds were provided by the Government (UA 5.02 million) and IFAD (UA 7.16 million) bringing the planned total project cost to an equivalent of UA 25.55 million
|
| 24/08/1998 |
Mali: Structural Adjustment Programme and Enhanced SAP (3.6 MB)
Abstract: This Project Performance Audit Report (PPAR) concerns both the Structural Adjustment Programme(SAP) and the Enhanced Structural Adjustment Programme of the Republic of Mali for which the African Development Fund (ADF) respectively Loan No.n° F/MAL/PAS/91130 amounting to UA 13,82 million in June 1991 and Loan No F/MAL/CON PAS/92/34 of UA 5,52 million in December 1992.
|
| 21/08/1998 |
Zimbabwe: First Line of Credit to Zimbabwe Development Bank (1.7 MB)
Abstract: This Intermediate Project Performance Audit Report (IPPAR) covers the first line of credit to Zimbabwe Development Bank (ZDB). The line of credit of UA 10.0 million was approved on 15 February 1990 and the loan agreement was signed on 31 May 1990. About 80 per cent of the approved amount was committed and fully disbursed within two years and the undisbursed amount was eventually cancelled. The relevant Project Completion Report was completed in June 1994.
|
| 20/08/1998 |
CAR: M’bali Dam Project (2.8 MB)
Abstract: The present intermediate project performance audit report is on the M’BaIi darn in CAR, for which the ADF granted to the Central African Government, on 23 November 1988, the F/CEF/ELC/88/26 loan of UA 11.10 million.
|
| 17/08/1998 |
Lesotho: Road Maintenance Project (3.0 MB)
Abstract: The present project performance audit report concerns the Road Maintenance Project in Lesotho, for which an ADF loan of UA 8.06 million was approved in December, 1983. The loan agreement was signed in August 1984 and the loan became effective in November 1984. The project was part of the World Bank’s Fourth Highway Project for which an IDA credit of US$ 15.2 million was approved in May 1984.
|
| 07/08/1998 |
Tunisia: Five Lines Of Credit Granted To Banque De Développement Economique De Tunisie(BDET) (3.6 MB)
Abstract: The present Project Performance Audit Report (PPAR) concerns five lines of credit granted by the African Development Bank to the Banque de développement économique de Tunisie (BDET) in August 1976, June 1980, December 1984 and February 1991, respectively.
|
| 30/06/1998 |
Mali: Second Line of Credit Granted to the Banque de Développement du Mali (2.6 MB)
Abstract: This project performance audit report (PPAR) concerns the second line of credit granted by the African Development Bank Group through its Nigeria Trust Fund (NTF) window to the Banque de developpement du Mali (BDM) in December 1985
|
| 17/06/1998 |
Zambia: Third and Fourth Lines of Credit to Development Bank of Zambia (1.8 MB)
Abstract: This Project Performance Audit Report (PPAR) covers the third and fourth lines of credit to Development Bank of Zambia (DBZ). The third line of credit of UA 10 million was approved on 16 March 1982, the related loan agreement signed on 05 May 1982, and its disbursement was completed in May 1989. As regards the fourth line of credit of UA 15 million, approval and loan signature were on 25 June, 1987 and 30 September, 1987 respectively while disbursement was completed in February 1992. A Project Completion Report covering both lines of credit was completed in March 1994.
|
| 10/05/1998 |
Madagascar: Emergency Aid Programme - Road Component (Ambohimasoa Mananjary: RN25) (2.8 MB)
Abstract: This report aims at carrying out an in-depth project performance audit of the road component of an emergency aid programme for the repair of the damage caused b the passage three cyclones between 1981 and February 1982. The Bank approved on 7 September 1982, an ADF loan of UA 10.75 for the financing of the programme, of which U 64.6 million was earmarked for’ the road component and UA 4.29 million for that of gricuI4re. The agreement was signed on 22 September 1982 and became effective on 13 January 11983.
|
| 13/03/1998 |
Tunisia: Railway Network Improvement in Sfax Region (839 KB)
Abstract: This abbreviated project performance audit report (PPAR) concerns the Railway Network Improvement Project in Sfax Region. The project, the total cost of which was estimated at UA 22.86 million, was identified and prepared by the SNCFT, and appraised by the Bank in February 1983. Its financing via a UA 11 million loan was approved in June 1984. The loan became effective sixteen months later, and the project was completed on 30 June 1993, eight years behind schedule.
|