| Date | Title |
|---|---|
| 07/09/1992 |
Burundi: Mosso Sugar Project (5.5 MB)
Abstract: This project performance audit report (PPAR) concerns the Mosso Sugar project in Burundi for the funding of which ADB loan loan number CS/BU/AGR/82/005 amounting to UA 10 million, was approved on 16 February, 1982. The project was designed under the Third Economic and Social Development Plan of Burundi to meet the domestic sugar demand because as far as this commodity was concerned the country depended entirely on imports. The project includes an industrial plantation of about 1,400 ha and a Sugar factory with the capacity to process 1,000 tonnes of sugar cane per day. It also has a social infrastructure. The Government was the borrower and the Société Sucrière du Mosso (SOSUMO) was the executing agency. The total project cost amounted to UA 63.37 million. ABEDA (BADEA), the Abu Dhabi fund, OPEC, German and local banks participated alongside the ADB in financing the Project.
|
| 30/07/1992 |
Burundi: Bujumbura Sewerage Project (3.5 MB) |
| 20/07/1992 |
Burundi: The Agricultural Commodities Project (3.0 MB)
Abstract: The present Project Performance Audit Report concerns the Agricultural Commodities Storage Project in Burundi, for which an NTF loan of 2.25 million BUA was granted on 23 February 1977. The total cost of the project was BUA 4.11 million. The project was executed from 1977 to May 1987, the date of last disbursement.
|
| 09/12/1988 | |
| 18/11/1985 |
Burundi: The Bujumbura - Mutambara & Mutambara Nyanza Lake Road Projects (2.1 MB)
Abstract: This report focuses on the post evaluation of the Bujumbura-Mutambara and Mutambara-Nyanza lake Roads Projects, forming the National Highway No. 3 (RN3), which benefited from ADF loans N. CS/BU/TR/75, and supplementary loans and N. CS/BU/TR/80/6 approved on 6/5/75, 31/1/80, and 18/9/80 respectively.
|