Projects Performance Evaluation Report
Displaying results 1 to 8 out of 8
- 1
| Date | Title |
|---|---|
| 06/11/2004 |
Egypt - El Arish Power Project (1.3 MB) |
| 15/05/2000 |
Egypt - Economic Reform And Structural Adjustment Programme - PPER (263 KB) |
| 02/12/1999 |
Egypt - El-Beheira Rural Development Project - PPER (114 KB) |
| 09/01/1995 |
Egypt: Polyester Filament Project II (566 KB)
Abstract: This Project Performance Audit Report (PPAR) is concerned with the expansion of polyester filament project, Misr Rayon Company, Kafr El-Dawar, the Arab Republic of Egypt (ARE). The first polyester filament project, partially financed by ADB, was completed in 1985 and had a capacity of 11 tons per day. The second polyester filament project was designed to produce 11 tons per day, but due to changes in the modality of implementation, the expansion project was completed by 24 tons per day.
|
| 17/11/1992 |
Egypt: Shoubrah El Kheima Power (7.0 MB)
Abstract: This Project Performance Audit Report (PPAR) reviews the Shoubrah El Kheima Projects (in the following called the Project) in the Arab Republic of Egypt.
|
| 17/07/1992 |
Egypt: First and Second lines of credit to the Development Industrial Bank Of Egypt (2.8 MB) |
| 25/11/1988 |
Egypt: Polyester Filament Project I (3.7 MB) |
| 22/10/1987 |
Egypt: The Power III Project (3.6 MB)
Abstract: The third ADB-financed electricity project in Egypt was conceived as part of the Egyptian Electricity Authority’s (EEA) post-war reconstruction and development programme for the coastal and desert towns on the Mediterranean and the Red sea. Its implementation was expected lnter-alia to provide electricity for the people who had never had it or who had been deprived there of as a result of the event which had taken place in the country from 1967 to 1973
|