Projects Performance Evaluation Report
Displaying results 1 to 6 out of 6
- 1
| Date | Title |
|---|---|
| 15/08/1999 |
Niger: Secondary Roads Project (169 KB)
Abstract: This report is the intermediate performance evaluation report (PPER) on the secondary roads project in Niger, implemented in two successive phases, each of which received a separate Bank loan. The UA 2.3 million ADF loan for financing the first phase was approved on 25 August 1983 and became effective 17 months later on 3 July 1985. The UA 4.6 million ADF loan to finance the second phase was approved on 18 June 1986 and became effective within the projected timeframe on 25 June 1987.
|
| 22/09/1994 |
Niger: The Ceao School of Mines and Geology (4.8 MB)
Abstract: This project performance audit report (PPAR) concerns the Niamey based School of Mines and Geology for which an ADF loan N° CS/N/ED/85/9) of UA 11.30 million was approved In February 1985 for the benefit of the 3enin, Burkina Faso Government of Niger representing the CEAO member States (Côte d’Ivoire, Mali, Mauritania, Niger, Senegal).
|
| 21/09/1992 |
Niger: The Kourani - Baria Irrigated Forming Devlopment Project (4.4 MB) |
| 09/06/1991 |
Niger: Niamey Sewerage Project (4.4 MB) |
| 09/05/1991 |
Niger: Construction of the Section of Zinder - Agadez Road (4.0 MB) |
| 12/12/1988 |
Displaying results 1 to 6 out of 6
- 1
