Projects Performance Evaluation Report
Displaying results 1 to 6 out of 6
- 1
| Date | Title |
|---|---|
| 03/08/2004 | |
| 19/07/2004 |
Tanzania National Agricultural and Livestock Extension Rehabilitation Project - PPER (1.0 MB)
Abstract: This is a Project Performance Evaluation Report (PPER) of the National Agricultural and Livestock Extension Rehabilitation Project (NALERP) in Tanzania. NALERP was conceived by the Government of Tanzania in 1987 at a time when the extension services had been fragmented between the Ministry of Agriculture and Livestock Development (MALD) and the various parastatals, and the food crop research did not receive appropriate priority. Key aspects of extension – supervision, training, logistics, linkages with other knowledge and input systems – had suffered from lack of resources and an inefficient institutional structure. NALERP was designed to resuscitate and rebuild the agricultural and livestock extension service through institutional rehabilitation and capacity building and human resource development.
|
| 29/08/2001 |
Tanzania Sector Rehabilitation Programme (618 KB)
Abstract: This is a Programme Performance Evaluation Report (PPER) for the Sector Rehabilitation Loan (SRL) for which Loan No. FZ/TZ/SRP(AGR-TR)87/17 in the amount of UA 28.55 million, was approved on 26 October 1987 and came into force on 29 December 1987 and closed in May 1997
|
| 25/04/1996 |
Tanzania: Rural Electrification Project (5.9 MB)
Abstract: OPEV has reviewed the PCR for the above-mentioned project, prepared ‘by the Infrastructure and Industry Department, South Region (SISI) in December, 1 992. Account has been taken of developments since the date of the PCR preparation. Please find below the results of QPEV’s review.
|
| 17/04/1991 | |
| 28/09/1987 |
Tanzania: Mingoyo - Masasi Road Project (2.1 MB)
Abstract: This Post-Evaluation Report (PER) concerns the Mtwara-Mingoyo-Masasi road project located in the Mtwara-Lindi regions of the United Republic of Tanzania. It was financed by the Bank on a parallel basis with the IDA and contributions by the Government. The Bank component, Mingoyo-Masasi (118 km), was financed by the ADB in the sum of UA 4.0 million, with total cost of UA 7.28 million.
|
Displaying results 1 to 6 out of 6
- 1
