South Hurghada Hasheesh & RASW


  • Reference: P-EG-EA0-001
  • Appraisal Date: 13/12/1901
  • Board Presentation: 13/12/1901
  • Status: PipelinePIPE
  • Implementing Agency: --
  • Location:


The study will consist of: phase I a) Water and waste water plans; b) Preliminary design and preparation of cost estimates for south Hurghada water System; and c)feasibility studies. Phase II Detailed design and preparation of tender documents (South Hurghada Waste water system).


The study objective is to prepare water and waste water master plans that satisfy the needs of the study area up to year 2020. Formulate a staged development programme that is technically and economically viable and environmentally sound.


The project area in addition of being a residential area deprived of proper water supply and sanitation facilities, it is an important tourist zone. The low water supply and sanitation standards had negative impact on the tourist industry. The improvement of the standards in the area will ameliorate the health conditions of the inhabitants and will give a boost to the tourist industry and enable the agents of the industry to expand this important income generating sector.


Detailed design and preparation of tender documents (South Hurghada Waste Waster System).

Key contacts

BENBARKA Ahmed Mohamed - OWAS2

Estimated Cost

UAC 400,000