Documents

Filtres de recherche
Date Titre
04/04/2013

East Africa Quarterly Bulletin - Fourth Quarter 2012 (1.3 MB)

04/04/2013

East Africa Quarterly Bulletin - Third Quarter 2012 (1.0 MB)

11/01/2013

Burundi - Multinational Burundi/Rwanda: Projet d’aménagement de routes (Mugina-Mabanda-Nyanza-lac et Rubavu-Gisiza) et de facilitation de transport sur le corridor nord-sud (phase III) - Tronçon de la RN3 Mugina-Mabanda-Nyanza-Lac - EOI (162 KB)

03/01/2013

Burundi - Projet multinational d’interconnexion des réseaux électriques des pays des lacs équatoriaux du Nil (Pmirel-Plen) - Conception, acquisition d’équipements, fourniture et installations - SPN (146 KB)

11/12/2012

Rwanda - Multinational (Burundi-Rwanda) - Project to Develop Roads (Mugina-Mabanda-Lake Nyanza and Rubavu-Gisiza) and Facilitate Transport on the North-South Corridor - Phase III - Supervision and Monitoring of Rubavu-Gisiza - EOI (160 KB)

11/12/2012

Rwanda - Multinational (Burundi-Rwanda) - Project to Develop Roads (Mugina-Mabanda-Lake Nyanza and Rubavu-Gisiza) and Facilitate Transport - Phase III - Technical Audit and Road Safety of North-South Corridor - Update on 12/12/12 - EOI (160 KB)

07/12/2012

Rwanda - Multinational (Burundi-Rwanda) - Project to Develop Roads (Mugina- Mabanda- Lake Nyanza and Rubavu- Gisiza) and Facilitate Transport on the North-South Corridor - Phase III - Road Studies of Kayonza - Rusumo-Kayonza - EOI (159 KB)

07/12/2012

Rwanda - Multinational (Burundi-Rwanda) - Project to Develop Roads (Mugina-Mabanda-Lake Nyanza and Rubavu-Gisiza) and Facilitate Transport on the North-South Corridor - Phase III - Study on Trade Facilitation on North-South Corridor - EOI (159 KB)

06/12/2012

Burundi-Kenya-Ouganda-Rwanda-Tanzanie - Communauté de l’Afrique de l’Est (CAE) - Projet d’intégration des systèmes de paiement et de règlement - Mise à jour le 12/12/12 - Rapport d’évaluation (847 KB)

14/11/2012

IFB - Lake Victoria Water and Sanitation Program - Phase II (LVWATSAN II) - Supply of Sludge Exhausters and Sludge Vacutugs (UGOTUGS) - AOI (78 KB)

14/11/2012

IFB - Lake Victoria Water and Sanitation Program - Phase II (LVWATSAN II) - Supply of Tractors with Trailers and Skip Containers - AOI (110 KB)

14/11/2012

IFB - Lake Victoria Water Supply And Sanitation Program - Phase II (LVWATSAN II) - Lot 1 Four Sludge Exhausters - Lot 2 Five Sludge Vacutugs - AOI (81 KB)

14/11/2012

IFB - Lake Victoria Water Supply and Sanitation Program - Phase II (LVWATSAN II) - Construction of Mayuge Town Water Supply System - AOI (82 KB)

14/11/2012

IFB - Lake Victoria Water Supply and Sanitation Program - Phase II (LVWATSAN II) - Supply of Nine Tractors with Trailers and Eighty Nine Skips - AOI (81 KB)

13/11/2012

East African Community - The East African Customs Interconnectivity Project - GPN (37 KB)

13/11/2012

Burundi - Projet d’aménagement des bassins versants et d’amélioration de la résilience climatique - Résumé PGES (541 KB)

01/11/2012

Rwanda-Burundi - Projet d’appui aux infrastructures rurales de la région naturelle de Bugesera - EOI (132 KB)

19/10/2012

Burundi - Document relatif au point de décision PPTE renforcée (394 KB)

Catégories: Burundi

19/10/2012

Burundi - Document relatif au point d'achèvement PPTE renforcée (537 KB)

Catégories: Burundi

03/10/2012

Burundi - Projet d’aménagement des bassins versants (PABV) - Rapport d'achèvement de projet (RAP) (546 KB)

Explorez nos activités

Thèmes

Sélectionnez un pays

Explorez nos
activités