Windhoek - Okanhandja - Road Improvements


Aperçu

  • Référence: P-NA-DB0-002
  • Date d'évaluation: 13/12/1901
  • Présentation au conseil: 13/12/1901
  • Statut: PipelinePIPE
  • Agence d'implémentation:
  • Emplacement:

Description

Consultant services for carrying out detailed engineering studies, cost estimates and preparation of tender documents.


Objectifs

To carry out detailed engineering design and contract documents for implementation of the civil works to solve the existing traffic problems.


Justificatif

The proposed road improvements will provide a high level of service to road users. With the increase routing of export and imports for the land. Lock countries to the east and north-east of Namibia through the Walvis Bay borders, the number of heavy vehicles on this road and hence platooning is expected to increase significantly and therefore will worsen traffic problems.


Bénéfices

Higher level of services is provided bo road users resulting to reduced vehicle operating costs, travel time and platooning. In addition, road safety will be enhanced.


Contacts clés

OPOKU-DARKWA Patrick - OITC2


Coûts estimatifs

Montant
UAC 241.365