Lekki Toll Road Project


Aperçu

  • Référence: P-NG-DB0-008
  • Date d’approbation: 18/06/2008
  • Date de début: 14/10/2008
  • Date d'évaluation: 27/07/2007
  • Statut: En coursOnGo
  • Agence d'implémentation: LAGOS STATE GOVERNMENT ( LASG)
  • Emplacement: Lagos, Nigeria

Description

Project consists of the following:

1Rehabilitation and widening of 1st 23km and rehabilitation of the last 26.5 km of the 49.5 km Lekki to Epe expressway in the Lekki corridor in Lagos city,

2Building of a new ramp at Falomo junction to carry right turning traffic onto the Falomo bridge

3Building of new foot bridges along the right of way to carry pedestrian traffic hence improving on road safety for pedestrians

4Building of the 1st 6km of the coastal which itself is contingent on the construction of the coastal defences by Lagos State Government

5Rehabilitation/building of 10 inter-connecting roads between the expressway and the coastal road


Objectifs

Improve overall transport infrastructure in Lagos State.

Upgrade expressway to lower travel times, improve road safety and lower vehicle operating costs. Improve security of road users.


Justificatif

Lagos's growing population especially along this corriodor has put pressure on the existing transportation infrastructure e.g the existing expressway leading to unacceptable traffic jam especially during the rush hour with travel times for relatively short distances e.g 5km of close to 4-5hours in places.

As a case in point, it took us 5.25 hours to travel from the Governor's office on the main land Lagos(on the date of the signing of finance doccuments) to travel to Victoria Island, a distance that under normal traffic situation should not take more than 30 minutes.


Bénéfices

Economic and social benefits to the people of Lagos state through improved road infrastructure, increase in road safety along the Lekki corridor, lower vehicle operating costs and incread employment to the people of Lagos. First PPP in the transport sector in Nigeria and will serve as a benchmark to other PPP concessions in the country.


Contacts clés

AKINWUMI Emmanuel Ibituase - OPSD4


Coûts

Source Montant
BADUSD 52.670.715
DeltaUSD 219.979.685
TotalUSD 272.650.400