Abbreviated Resettlement Plans

17-May-2019

Multinational : Malindi - Lunga Lunga/Tanga - Bagamoyo Road Corridor Development – RAP Summary for the proposed upgrading of Mombasa - Mtwapa - Kwa Kadzengo - Kilifi (A7) Section , Kenya

The Government of the Republic of Kenya, through its implementing agency, the Kenya National Highways Authority (KeNHA) and support of the African Development Bank (AfDB) is undertaking review of the Mombasa-Mtwapa-Kadzengo-Kilifi (55 Km)Section of the A7 Highway which previously underwent Feasibility Study and Detailed Design as part of the Multi-national Lunga Lunga-Mombasa-Malindi (A7) Road Project. Towards this, KeNHA commissioned a consortium led by Uniconsult Engineering Consultants Ltd to undertake the Consultancy Service for Review of the Feasibility Study, Environmental and Social...
17-May-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PARA

Le présent document résume le Plan d’action de réinstallation abrège (PARA) du Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa-N’Djili-Batshamba. Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du...
14-May-2019

Niger - Projet d’aménagement et de bitumage de la route Tamaske-Kalfou-Kolloma y compris la bretelle de Tamaske-Mararraba (63 Km) – Résumé PAR

Le présent document résume le Plan d’Action de Réinstallation du projet d’aménagement et de bitumage de la route Tamaské-Kalfou-Kolloma y compris la bretelle de Tamaské-Mararraba (63 km) dans la région de Tahoua. Ce projet s’inscrit dans le cadre du Programme de la Renaissance acte 2 du gouvernement de la République du Niger, à travers lequel un Plan de Développement Économique et Social (PDES) 2017-2021 a été élaboré et adopté le gouvernement. Ce PDES prend en compte les projets et programmes prévus par la Stratégie Nationale des Transports en vue de renforcer et préserver le réseau routier...
13-May-2019

Mozambique - Mueda-Negomano Road Upgrading Project – Phase II (Roma/Mueda) – ESIA/ARAP summaries

The Government of Mozambique (GoM), through the National Roads Administration (ANE) intends to use the funds from the African Development Bank (AfDB) to rehabilitate the road N381/2151 from Mueda to Roma 95 km, in the district of Mueda, Cabo Delgado Province in northern Mozambique. The project road is part of the Mtwara Corridor, as defined in the SADC Protocol. The Environmental and Social Impact Assessment (ESIA) was undertaken in July 2016 and updated in May 2019 in fulfilment of the requirements of the AfDB’s Integrated Safeguards System (ISS) as well as those of Mozambique Environmental...
01-Apr-2019

Lesotho - Lesotho Highland Water Project Phase II – RAP Summary

The idea to transfer water from Lesotho to South Africa - considered as early as the middle 1950s - came to fruition in 1986 with the signing of the Treaty on the Lesotho Highlands Water Project between the Government of the Kingdom of Lesotho and the Government of the Republic of South Africa. The Treaty established the Lesotho Highlands Water Project (LHWP), to divert water from Lesotho’s Senqu River system to the upper reaches of the Vaal River in South Africa through the construction of a series of dams and tunnels for the mutual benefit of both Lesotho and South Africa. The Treaty...
29-Jan-2019

Multinational - Ethiopia – Djibouti Transport Corridor Project Phase I – RAP Summary

The proposed Adama-Melka Jilo (60km) Expressway is a continuation of the existing Addis Ababa- Adama expressway and part of the planned Adama-Dire Dawa Expressway project, which has been designed in recognition of the high level of congestion on the existing Addis Ababa – Djibouti road. A large portion of the traffic on this road are heavy loaded trucks transporting import and export goods. The project is located in the central eastern part of Ethiopia, within the corridor of the existing Addis Ababa – Adama – Awash – Djibouti trunk road, and traverses 3 districts of Oromia and Amhara...
28-Jan-2019

Malawi - Nacala Road Corridor Project Phase IV Project (Nsipe-Liwonde M1/M8 Road Section) - ESIA and RAP Summary

Malawi Government, through the Roads Authority with funds from the African Development Bank, intends to rehabilitate the Nsipe – Liwonde (Mangochi Turn-off) Road with the view to upgrade it to a Regional Trunk Road (RTR) as part of the Nacala Road Corridor. The proposed road project starts from Nsipe(M1 Road) up to Chingeni on MI road and Chingeni to Mangochi Turn Off on M3, a distance of 55 km long. The road will have a carriageway of 7 meters and 1 meter width sealed shoulders on either side and will have a 200 mm base of crushed stone and a 150 mm sub base. The road starts from Nsipe to...
11-Jan-2019

Niger - Project to support the Kandadji ecosystems regeneration and Niger Valley development programme (P_KRESMIN) – Summary RAP 2A

This document is a summary of the Resettlement Action Plan Phase 2 (RAP 2A) of the Project to support Kandadji Ecosystems Regeneration and Niger Valley Development Programme. The first phase of the Programme entailed the preparation and implementation of a resettlement plan for the displacement of persons affected by the construction of the dam (RAP 1). For this first phase, a number of preparatory works were carried out: construction of a temporary bridge, construction of the contracting authority’s camp and protection of cofferdams. Populations affected by this wave of displacement are...
03-Dec-2018

Tanzania - Proposed Upgrading of the Dodoma City Outer Ring Road (110.2km) To Bitumen Standard, Dodoma Region – Rap Summary

The Government of the United Republic of Tanzania with the assistance from African Development Bank (AfDB) intends to upgrade the Dodoma City Outer Ring Road (110.2 km). The project is being implemented by Tanzania Roads Agency (TANROADS). TANROADS is an Executive Agency under the Ministry of Works, Transport, and Communication; established under the Executive Agencies Act in 2000, with the duty of maintaining and developing trunk and regional road network in Tanzania Mainland. In broad terms, improvement will involve a construction of new road. The rehabilitation and/or replacement of...
28-Nov-2018

Nigeria - Ebonyi State Ring Road - RAP Summary

The Ebonyi state government proposes to borrow the total sum of $150 million from the African Development Bank (ADB) and Islamic Development Bank (IsDB) for the reconstruction/ rehabilitation of the 198 km existing Abakaliki Ring Road into a standard one carriageway, 2 - lane road finished with asphalt over lay over the road pavement. The pavement substratum is designed to have a compacted sub soil layer preferably of laterite. This layer is expected to be the stable bed on which the road pavement is carried. The Abakaliki Road Project, otherwise known as the State Ring Road Project, will...
22-Nov-2018

Zambia-Zimbabwe-Botswana-Namibia Interconnector (ZiZaBoNa) – Phase A – ARAP Summary

The ZIZABONA transmission project consists of the development, financing, construction and operation of new transmission facilities in Zambia and Zimbabwe, Botswana and Namibia with the view to facilitate the establishment of a western transmission corridor in Southern Africa. The project derives its name from the first two letters of each of the four countries involved. The electricity utilities of Zimbabwe, Zambia, Botswana and Namibia signed an Inter-Utility Memorandum for the development of the transmission network called ZIZABONA in 2007, and an Inter-Governmental Memorandum of...
12-Oct-2018

Bénin - Projet de construction de la centrale thermique 145MW à moteurs dual fuel (GAZ-HFO) sur le site de MARIA-GLETA 2 - Résumé du cadre social et le processus d’acquisition de terre

Le présent document constitue le résumé du processus d’acquisition de terre du projet de la construction de la centrale thermique de Maria Gléta au Bénin. Une Etude d’Impact Environnemental et Social (EIES) qui inclut un Plan de Gestion Environnemental et Social (PGES) a été réalisée par TRACTEBEL pour le compte du Gouvernement du Bénin (2017) et un Certificat de Conformité a été délivré par l’Agence Béninois de l’environnement (ABE) le 11 Avril 2017. Afin d’attribuer l’EIES aux exigences des organisations prêteuses, une mise à jour de l’EIES a été préparée par les consultants d’ERM en 2018,...
10-Aug-2018

Multinational - Burundi-Rwanda Interconnection of Electricity Grids Project - Summary RAP

This document summarizes the Comprehensive Resettlement Plan (CRP) of the Electricity Interconnection Project linking Rwanda (Kigoma-Butare) to Burundi (Ngozi-Gitega). The interconnection of Burundian and Rwandan electricity grids by connecting the Gitega, Ngozi, Butare and Kigoma localities is part of the Nile Equatorial Lakes Subsidiary Action Programme Interconnection of Electric Grids Project known by its English acronym NELSAP. The total planned length of the 110-220 kV line is 140.7 km, comprising 61.5 km in Rwanda and 79.2 km in Burundi. The building of two new transformer substations...
30-Jul-2018

Côte d’Ivoire – Libéria - Programme de développement routier et de facilitation du transport de l’union du fleuve mano (UFM/RDTFP) (Deuxième phase) relatif au tronçon Sanniquellie–Loguatuo – Résumé PAR

Le projet proposé porte sur la construction de la route reliant Sanniquellie à Loguatuo, à la frontière ivoirienne. Il sera réalisé le long de la route de terre qui existe déjà. La route Sanniquellie-Loguatuo couvre une distance estimée à 47,98 km. L’emprise du projet suivra principalement les routes non bitumées existantes et l’impact global devrait se faire sentir surtout sur la végétation et plusieurs cours d’eau le long du corridor.
27-Jul-2018

Uganda - Kampala Jinja Expressway PPP Project – RAP Summary

The African Development Bank is considering a financial support for the Phase 1 of the Kampala – Jinja (KJE) PPP Project which consists of a limited access tolled expressway from the Central to the Eastern Regions of Uganda in East Africa. The overall project (which includes Phases 1 and 2) comprises the Kampala Jinja Expressway Mainline from the capital city of Kampala to the town of Jinja in the east and the Kampala Southern Bypass (KSB) (See Plate 1 in Annexure of the ESIA Summary. This RLRAP Summary Report highlights the key social impact assessments and management plans designed by the...
27-Jul-2018

Burundi/Tanzania - Rehabilitation of Bujumbura – Rumonge – Rutunga -Bujumbura Road Section – RDGE - RAP summary

The Rumonge - Bujumbura road section is one of the EAC roads under the Multi-National Tanzania/Burundi: Nyakanazi-Kasulu-Manyovu/Rumonge-Rutunga-Bujumbura Road Project. The Project objective is to rehabilitate and upgrade the existing Rumonge–Bujumbura road (78km) section to bituminous that conform to East African Community standards with the aim of enhancing trade, transport and tourism in the East African Region as well as improving socioeconomic conditions for the population along Lake Tanganyika.
27-Jul-2018

Benin - Aménagement et bitumage de la route Djougou – Pehunco – Kerou -Banikoara – Résumé PAR

Le présent document constitue le résumé du Plan d’Action de Réinstallation (PAR) du projet d’aménagement et de bitumage de la route Djougou – Pehunco – Kerou –Banikoara en République du Bénin et qui s’étend sur 210 km. Du point de vue environnemental et social, le projet est classé dans la catégorie 1, au regard de la nature des travaux à entreprendre, de la taille et de l’envergure du projet, ainsi que de ses effets potentiels directs et indirects.
02-Jul-2018

Zimbabwe - North-East Network Rehabilitation Project – RAP Summary

The proposed project involves construction of a Single Wolf 132kV transmission line from Atlanta 132/36kV substation to Mutoko town. The existing Atlanta substation already has space to accommodate a new line bay. The transmission line will terminate in the proposed Mutoko 132/33kV substation in Mutoko town centre. The new Mutoko 132kV substation will be equipped with 2 x 30/50MVA transformers and 7 x 33kV line bays (and a high capacity 36kV line will be constructed from Mutoko) and will have a footprint of approximately 1.5 hectares. An access road will be constructed to the substation site...
25-Jun-2018

Malawi - Proposed construction of main canal from intake to lengwe national park under the shire valley transformation program (Phase 1) – RAP Summary

The Shire Valley Transformation Program will be implemented in Chikwawa and Nsanje Districts south of Malawi. Its objective is to contribute to poverty reduction through increased value addition and provision of infrastructure for increased agricultural productivity and climate adaptation. The project timeframe is seven years from 2018 to 2025 and total cost net of taxes and duties, is UA 155.93 million. The Bank is contributing: i) ADF loan of UA 20 million, ii) NTF grant of UA 4.5 million, iii) OFID loan of UA 11 million (USD 15 million) and, iv) TAAT Grant of UA 0.7 million; totaling UA 35...
18-Jun-2018

Burundi and Tanzania - Multinational: RN3: Rumonge – Rutunga -Bujumbura Section [77.6 km] and Kabingo-Kasulu-Manyovu [300.1 km] Road Upgrade Project – RAP Summary

Road transport plays a significant role in the socio-economic development of both Tanzania and Burundi and accounts for more than 90% of motorized freight and passenger traffic in the two countries. The significant part of both countries’ road networks form part of the East African Community (EAC) regional trunk road network and therefore serve as transit for exports and imports through the Dar-es-Salaam port for the land locked countries to the west, namely, Burundi, Eastern DRC, Rwanda and Uganda. As such the two countries have developed investment programs in the transport sector to...