Environmental & Social Assessments

26-Jul-2019

Burundi - Bujumbura Port and Lake Tanganyika Transport Corridor Development Project - ESIA Summary

Bujumbura Port is the largest port in Burundi and on Lake Tanganyika (followed by the ports of Matulungu in Zambia, Kalémie in the Democratic Republic of Congo (DRC) and Kigoma in Tanzania). The port was built in the 1950s and although its facilities and equipment are old, they are considered to be in a relatively good state of repair. In 2010, the port’s facilities and equipment handled some 170 000 tonnes of goods, 100 000 of them by lake and 70 000 by land. The different crises suffered by the region resulted in the lack of investment in and poor maintenance of transport infrastructure...
18-Jul-2019

Uganda – Kabale-Bunyonyi, Kisoro-Mgahinga Road Project – ESIA and RAP Summary

The Uganda National Roads Authority (UNRA) is proposing to upgrade a select number of national roads from gravel to paved standard to facilitate mobility, trade and tourism within southwestern Uganda. The select national roads have the following characteristics: LOT 5a: Kabale-Lake Bunyonyi(7.8km), including Bunyonyi- Kabeho link (7.3km) LOT 5b: Kisoro-Mgahinga (13km), including Nyarusiza - Muhavura gate (5km)
28-Jun-2019

Madagascar - Projet de renforcement et d’interconnexion des réseaux de transport d’énergie électrique à Madagascar, Phase I (PRIRTEM I) – Résumé EIES

Madagascar dispose d'un potentiel considérable d’énergie renouvelable (hydroélectrique, solaire, éolienne) insuffisamment mis en valeur. Le taux national d'accès à l'électricité n'est que de 15 % et de seulement 5,21% en milieu rural. Dans le cadre de la Politique Générale de l'Etat (PGE), et le Plan national pour l'Emergence de Madagascar (PEM), l’accent est mis sur l'accès a l’énergie, notamment pour atteindre un taux d'électrification de 50% en 2023 et de 70% en 2030.
28-Jun-2019

Madagascar - Projet de renforcement et d’interconnexion des réseaux de transport d’énergie électrique à Madagascar, Phase I (PRIRTEM I) – Résumé PAR

Le Projet d’Interconnexion et de Renforcement des Réseaux de Transport d’Energie Electrique à Madagascar (PRIRTEM), prévoit l’électrification des localités le long des lignes l’interconnexion projetées afin d’atteindre le taux d’électrification national de 70% d’ici l’année 2030. Le PRIRTEM comprend six composantes comme indiqué dans le Tableau 1.
28-Jun-2019

Morocco - Project for the sustainable management of water resources in the Sebou Basin (PSMWRS) – Sidi Abbou Dam - Summary FPLAC-PAP

At the request of Moroccan authorities, the African Development Bank Group will support the implementation of the Project for Sustainable Water Resources Management in the Sebou Basin (PGDRES) - Sidi Abbou Dam in Morocco. From an environmental and social standpoint, the project is classified under Category 1 as its implementation will result in the physical and economic displacement of more than 200 people as well as the flooding of approximately 590 ha of agricultural land, displacement of 72 households and loss of livelihoods for 930 inhabitants, about 30% of whom are women. Hence, the...
28-Jun-2019

Morocco - Project for the sustainable management of water resources in the Sebou Basin (PSMWRS) – Sidi Abbou Dam - Summary ESIA

The project proposed for Bank financing consists in the construction of a new Sidi Abbou dam on the Leben Wadi situated in Ain Maatouf Commune, Taounate Province. Based on the Integrated Safeguards System (ISS), the project was classified in Category I since its development will cause the physical and/or economic expropriation of over 200 people alongside the flooding of about 590 ha of agricultural land, the displacement of 72 households and loss of livelihoods for 930 people, about 30% of whom are women. The project was subject to Environmental and Social Impact Assessment (ESIA),...
25-Jun-2019

Côte d'Ivoire - Projet de construction et d’exploitation d’un centre d’enfouissement technique à Kossihouen pour l’élimination des déchets solides ménagers et assimilés du District Autonome d’Abidjan - Résumé EIES

La gestion des déchets est un grave problème de santé et d’assainissement en Côte d’Ivoire et principalement dans le district d’Abidjan, en raison de l’augmentation rapide de sa population, passant de 125 000 habitants en 1955 à environ 4.395.000 d’habitants, selon le dernier recensement.la croissance est d’environ 4% par an, ce qui impose des contraintes supplémentaires aux services, notamment les services de salubrité. Environ 75% seulement des déchets sont collectés à Abidjan et...
25-Jun-2019

Côte d'Ivoire - Project for the construction and operation of a technical landfill centre in Kossihouen for the disposal of household and similar solid waste in the Abidjan Autonomous District (DAA) - Esia Summary

Waste management in Côte d’Ivoire, especially in Abidjan District, is a serious health and sanitation problem because of the rapid increase in its population from 125,000 in 1955 to about 4,395,000 inhabitants according to the most recent census.  The annual population growth rate is about 4%, which puts additional pressure on services, in particular, sanitation services. Only about   75% of waste is collected in Abidjan and disposed of in a landfill site. The remaining 25% remains uncollected, which creates unsanitary conditions in the city of Abidjan. In 2007, the...
25-Jun-2019

Projet de construction et d’exploitation d’un centre d’enfouissement technique (CET) à Kossihouen pour l’élimination des Déchets Solides Ménagers et Assimiles (DSMA) du District Autonome d’Abidjan (DAA) - Résumé EIES

La gestion des déchets est un grave problème de santé et d’assainissement en Côte d’Ivoire et principalement dans le district d’Abidjan, en raison de l’augmentation rapide de sa population, passant de 125 000 habitants en 1955 à environ 4.395.000 d’habitants, selon le dernier recensement.la croissance est d’environ 4% par an, ce qui impose des contraintes supplémentaires aux services, notamment les services de salubrité. Environ 75% seulement des déchets sont collectés à Abidjan et éliminés dans un site d'enfouissement. Les 25% restants restent non collectés, ce qui entraîne des conditions...
17-Jun-2019

DRC - Project to protect and rehabilitate RN1 between Kinshasa/N'djili–Batshamba – Summary ARAP

This document summarises the Abbreviated Resettlement Action Plan (ARAP) of the Project to Protect and Rehabilitate RN1 between Kinshasa/N'djili–Batshamba. This first national highway rehabilitation project along the Kinshasa-Batshamba segment extends from Nsele bridge (PK615+00) to Batshamba (PK1.238+00). It is located in the Democratic Republic of Congo (DRC), within the central economic zone retained in the Bank's Country Strategy Paper.
17-Jun-2019

Mali - Projet mise à l'échelle d'une approche intégrée pour améliorer la résilience au changement climatique dans les zones agroforestières et forestières du Mali (Kayes, Koulikoro et Ségou), MAIR-2C – Résumé CGES

L’objectif de l’EESS sera (i) d’établir un mécanisme pour déterminer et évaluer les impacts environnementaux et sociaux potentiels (incluant les impacts sur la santé publique) des types de projets/sous projets pouvant être financés dans le cadre du projet ; (ii) de définir de manière générale les mesures d'atténuation et de suivi à prendre pour soit éliminer les impacts environnementaux et sociaux adverses, soit les ramener à des niveaux acceptables et (iii) définir les modalités institutionnelles pour la mise en œuvre du CGES.
17-Jun-2019

Burundi - Projet de création du centre d’excellence en nutrition au Burundi (EANSI)- Bujumbura – Résumé PGES

La Banque s’est engagée depuis 2014 dans l’appui aux centres d’excellences dans l’enseignement supérieur en santé, et ce dans tous les pays membres de la Communauté des États de l’Afrique de l’Est (AEC) sauf le Burundi. Ce projet cherche à renforcer l'enseignement supérieur et établir, au Burundi, un centre d'excellence à vocation régionale pour l'enseignement supérieur médical, la recherche, les services spécialisés de soins de santé au sein de l’EAC. L’objectif principal du projet est de renforcer la sécurité nutritionnelle et la croissance économique dans la région de la communauté Est...
17-Jun-2019

Eastern and Southern African Trade and Development Bank ESMS Policy January 2019

The Environmental and Social Management System (ESMS) was developed to outline the requirements and obligations of The Eastern and Southern African Trade and Development Bank (TDB) as they relate to Environmental and Social (E&S) performance. The System is used to evaluate the Environmental and Social performance of all potential investment opportunities and to monitor the E&S performance of the current financed operations.
16-Jun-2019

Geofutures Fund Managers Environmental and Social Management System ESMS (Amharic)

15-Jun-2019

GeoFutures Fund Managers Environmental and Social Management System (ESMS)

GeoFutures Investment Fund (“The Fund” or “GF1”) is a newly established investment vehicle developed to invest in geothermal projects in Emerging Markets, including Africa. The investments will take the form of convertible and non-convertible debt instruments and The Fund will provide a full spectrum of investment support and advisory services including environmental and social governance (ESG) management
13-Jun-2019

Burkina Faso - Projet d’aménagement et de valorisation de la plaine de Léraba (PAVAL) - Résumé PGES

Le projet d’Aménagement et de Valorisation de la Plaine de la Léraba, fait partie du vaste Programme de développement de l’agriculture irriguée du Burkina Faso, visant à Contribuer à l’atteinte de la sécurité alimentaire et à la réduction de la pauvreté. Il consiste spécifiquement en l’aménagement et à la valorisation d’une superficie de 1400 ha de périmètre irrigué d’une plaine située dans le Département de Douna, Province de la Léraba de la Région des Cascades, à travers la maitrise de l’eau (existence d’un barrage contenant un volume d’eau pouvant irriguer environ 1500 ha), en vue de...
13-Jun-2019

Guinée Bissau - Projet Promotion de l'entreprenariat agricole et rural dans les chaines de valeur (PROPEAR-CV) – Résumé CGES

L’objectif de l’EES est de faire une revue générale du contexte dans lequel évoluera le projet afin d’établir un processus de sélection environnementale et sociale qui permettra aux structures chargées de la mise en œuvre du projet de pouvoir identifier, évaluer et atténuer les impacts environnementaux et sociaux potentiels des activités du PROjet de Promotion de l'Entreprenariat Agricole et Rural dans les Chaînes de Valeur (PROPEAR-CV) au stade de planification des activités opérationnelles. Les résultats de la sélection indiqueront si un travail environnemental additionnel sera requis ou...
13-Jun-2019

Sénégal - Projet de valorisation des eaux pour le développement des chaines de valeur (PROVALE-CV) – Résumé EESS

Dans la vision d’un Sénégal Emergent à l’horizon 2035 avec une société solidaire dans un Etat de droit, le Sénégal s’appuie sur le Plan Sénégal Emergent (PSE). Le secteur agricole, en raison de son fort potentiel, occupe une place centrale dans l’axe 1 de ce plan qui vise une transformation structurelle de l’économie.
12-Jun-2019

Multinational - OMVG Energy Project – Summary FRP

The Gambia River Basin Development Organization Energy Project (OMVG Energy Project) involves the following four countries: Gambia, Guinea, Guinea-Bissau and Senegal. This subregional organization is the executing agency for integrated development programmes in the region, and focuses particularly on the rational management of the joint resources of Rivers Gambia, Kayanga-Géba and Koliba-Corubal, whose basins have power-generating potential.
05-Jun-2019

Ghana - Program on Affirmative Finance Action for Women in Africa (AFAWA): Financing climate resilient agricultural practices in Ghana - ESMS

The African Development Bank’s Feed Africa Strategy has identified innovative financing as critical to mobilizing resources for Climate Resilience Agricultural (CRA) transformation in the continent. The Risk Sharing Financing Mechanism has been proposed as one of the flagships for the Feed Africa Strategy and is premised on developing de-risking instruments, technical assistance, integrated ICT platforms, performance management, and incentives that would bridge the gaps between CRA and financing value chains. With the financial support from the AfDB, Ghana has taken the lead under this...