The LHWP is a multi-phased project aimed at providing water to South Africa (Gauteng) and generating hydro-electricity for Lesotho. It was established by the 1986 Treaty signed by the governments of the Kingdom of Lesotho and the Republic of South Africa. The project entails harnessing the waters...
01-Apr-2019
Lesotho - Lesotho Highland Water Project Phase II (LHWPII) - Polihali Western Access Corridor - ESIA Summary
The LHWP is a multi-phased project aimed at providing water to South Africa (Gauteng) and generating hydro-electricity for Lesotho. It was established by the 1986 Treaty signed by the governments of the Kingdom of Lesotho and the Republic of South Africa. The project entails harnessing the waters...
The Kenol – Sagana – Marua Road is part of the “Great North Road” from Mombasa, through Nairobi and on to Moyale - and hence to Ethiopia and Addis Ababa. It forms part of the 800km stretch between Nairobi and Moyale and is situated in the three counties of Muranga, Kirinyaga and Nyeri. The road...
27-Mar-2019
South Sudan - Strategic Water Supply and Sanitation Improvement Project (SWSSIP) - ESMP Summary
The proposed Bank group financing to the RWSPILJ is the Bank’s response to a formal request by the GRSS to support its efforts aimed at State Building through Capacity Building and Infrastructure Development and the need to rehabilitate and extend existing water and sanitation infrastructure in...
The Kenol – Sagana – Marua Road is part of the “Great North Road” from Mombasa, through Nairobi and on to Moyale - and hence to Ethiopia and Addis Ababa. It forms part of the 800km stretch between Nairobi and Moyale and is situated in the five counties of Muranga, Kirinyaga, Machakos, Embu and...
Sudan is largely dependent on imported fossil fuels for power generation. Hence, there is an urgency to implement Sudan’s Renewable Energy Master Plan (REMP) and reduce Sudan’s dependence on fossil fuel. Sudan has abundant wind and solar resources, but largely lacks the capacity to utilize these...
L’objectif principal de l’étude est de « vérifier la conformité du projet vis-à-vis des principes de réinstallation ». Il s’agira donc d’élaborer un plan de réinstallation des populations situées dans l’emprise des travaux de construction de l’autoroute Dakar-Saint Louis susceptibles d’être...
Le Gouvernement du Sénégal souhaite mettre en place un large réseau structurant d’autoroutes, dans le cadre de la mise en œuvre du Plan Sénégal Émergent (PSE). Ce dernier vise non seulement à assurer la liaison des grands pôles économiques du pays mais également à développer les échanges...
Dans le cadre de la politique d'accès à l'électricité du gouvernement ivoirien et en réponse aux besoins croissants en électricité de la Côte d’Ivoire, la société ERANOVE envisage d’augmenter la capacité de production d’électricité qu’elle possède au travers de sa société CIPREL par la construction...