Submit a document / information request

The transport sector is a key link of the Cameroonian economy and an essential support to the country’s accelerated growth strategy, particularly through its significant support to the implementation of productive sectors strategies (i.e. in agriculture and rural development, mines, industry, urban...
The project objective is to asphalt a section of National Road No. 11 (RN11), namely the Bamenda-Ndop-Kumbo-Nkambe-Misaje-Mungong-Kimbi-Nyos-Weh-Wum-Bamenda“Ring Road” (approximately 357 km long) in Cameroon’s Northwest Region. The project has been assigned Category 1 in view of its potential...
The African Development Bank is considering a financial support for the Kakono Hydroelectric Power Project within the Karagwe and Misenyi Districts, Kagera Region of the United Republic of Tanzania (See location map in Annex 1 of this Summary Report).
The African Development Bank is considering a financial support for the Kakono Hydroelectric Power Project within the Karagwe and Misenyi Districts, Kagera Region of the United Republic of Tanzania (See location map in Annex 1 of this Summary Report). The proposed project comprises of the following...
Le site devant abriter le Parc Agro industriel de Bukanga Lonzo couvre une superficie de 80.000 ha à 250 km au sud-est de Kinshasa et s’étend sur les provinces du Kwango et Kwilu et concernera aussi la ville province de Kinshasa où sont implantés les points de vente des produits du PAI-BL. L’appui...
Le site devant abriter le Parc Agro industriel de Bukanga Lonzo couvre une superficie de 80.000 ha à 250 km au sud-est de Kinshasa et s’étend sur les provinces du Kwango et Kwilu et concernera aussi la ville province de Kinshasa où sont implantés les points de vente des produits du PAI-BL. L’appui...
Le programme PAI-BL vise à stimuler une croissance du secteur agricole indispensable pour réduite la pauvreté, assurer la sécurité alimentaire et nutritionnelle des populations congolaises et générer durablement des emplois et des revenus. Le site devant abriter le Parc Agro industriel de Bukanga...
This document is a summary of the Environmental and Social Impact Assessment (ESIA) framework of the Livestock and Fish Farming Value Chain Development Project (PD-CVEP), particularly its construction activity of a 200-head/day modern pig slaughterhouse in Yaoundé, precisely at a location called...
This document is a summary of the Environmental and Social Impact Assessment (ESIA) of the Project to Construct a Modern Cattle Slaughterhouse in Bamenda-Alabukom. The detailed design of the modern slaughterhouse construction project will be provided by the developers of the said project, once...