You are here

EOI – Tanzania - Construction Supervision of Upgrading of Lot 1: Kasulu Junction - Manyovu including Kasulu Town links (68.25 km) i) Kasulu - Manyovu Section (58.80 km) and ii) Kasulu Town links (9.45 km)

05-Mar-2019

The Government of the United Republic of Tanzania has applied for a loan from the African Development Bank (AfDB) towards the cost of Upgrading of the Kabingo - Kasulu - Manyovu Road (260.6 km) to Bitumen Standard and intends to apply part of the proceeds of the loans for eligible payments for consulting services for Construction Supervision of Upgrading of Lot 1: Kasulu Junction - Manyovu including Kasulu Town links (68.25 km) i) Kasulu - Manyovu Section (58.80 km) and ii) Kasulu Town links (9.45 km).

Related Sections