Evaluation of the Quality and Process of Supervision of Bank Project and Program Implementation

Publishing Date 24/08/2015

Download File (1.2 MB)

Evaluation of the Quality and Process of Supervision of Bank Project and Program Implementation (1.2 MB)

Description

The review notes that the Bank’s guidelines and provisions, with respect to the monitoring and supervision of operations, are adequate and compare favourably with those of the sister institutions, and takes note of the updating work currently underway. The study also considered that the objective of at least one annual supervision per project is appropriate. However, the frequency of the supervision should depend on the complexity of the project and the study therefore recommends that the possibility of several supervision missions should be left open. It nonetheless concludes that the Bank’s operations supervision still lacks both in frequency and quality.

Download File (1.2 MB)

Evaluation of the Quality and Process of Supervision of Bank Project and Program Implementation (1.2 MB)