IFB – Multinational - Upgrading of Kabingo – Kasulu - Manyovu (260.6 km) road to bitumen standard, lot 3: Mvugwe – Nduta junction (59.35 km) section

Publishing Date 22/05/2019 10:14

Categories: Burundi, Tanzania, Transport

Download File (86 kB)

IFB – Multinational - Upgrading of Kabingo – Kasulu - Manyovu (260.6 km) road to bitumen standard, lot 3: Mvugwe – Nduta junction (59.35 km) section (86 kB)

You are currently offline. Some pages or content may fail to load.