Management hereby submits to the Board of Directors for approval a request from the Government of Kenya(GOK) for the utilisation of projects loan savings of UA 17.82 million of which UA 14.69 million from the savings of Nairobi –Thika Highway Improvement Project approved by the Boards in November 2007 and UA 3.13 million from the savings of the Education III project approved by the Board in December 2003.The GOK request and basic information of the two loans are attached as Annex 1 and Annex 2 respectively. The implementations of these projects have been completed as originally conceived.The savings will be utilised to finance the construction of an interim terminal at the Jomo Kenyatta International Airport (JKIA) as part of an emergency recovery measures undertaken by the Government of Kenya following the fire accident at the airport,which took place on 7 August 2013.