Mali - Point Y- Woyowayanko Bridge Bamako Urban Road Section Upgrade Project - ESIA Summary

12-Apr-2010

This project concerns the upgrading of the RN5 trunk road section running from Woyowayanko Bridge to Point Y at Sébénikoro into a 2X2 carriageway. The purpose of the project is to: (1) guarantee the fluidity of current and projected traffic; (2) extend the upgrading of the road up to the section upgraded into a 2x2 carriageway between Monument de la Paix and Woyowayanko Bridge; (3) ensure the safety of users and local residents; (4) improve the quality of life of local residents and of the environment as a whole; and (5) ensure that the upgrade fits into the roundabout "interchange" at Rond Point de la Paix.