Mozambique - Massingir Dam Emergency Rehabilitation Project (MDERP) - ESMP Summary

01-Jun-2009

The Massingir Dam Emergency Rehabilitation project (MDERP) seeks to support the rehabilitation of the bottom outlet structure of the Massingir Dam to ensure the safety and operational efficiency of the dam. The proposed works will comprise (i) Repair to the bottom outlet conduits, (ii) Repair to the existing bottom outlet steel liner, and (iii) Rehabilitation of the bottom outlet hydro-mechanical equipment.