Mozambique - Mozambique LNG – ESIA Summary

26-Apr-2019

The Project entails the design, build, operate, and transfer of an integrated Liquified Natural Gas (LNG) plant, including: offshore extraction, underwater pipeline, onshore processing plant, as well as ancillary support facilities. The Project will have a capacity of 12.88 mmtpa of LNG and will source gas from the Golfinho-Atum (GA) field within “Area 1,” which is located 40 km off the coast of Mozambique. Area 1 has ~75 trillion cubic feet (Tcf) of recoverable gas, implying a resource life of ~120 years at the initial production rate of 12.88 m tonnes of LNG per year. The Project will supply gas for LNG exports (mainly to Europe and Asia) and domestic consumption, thereby fueling industrial development in the country and the larger southern African region.