Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)

Publishing Date 15/01/2014 18:52

Categories: Benin, Togo, Energy & Power, Transport

Download File (7.83 MB)

Multinational: Nangbeto Hydroelectric Dam (Benin/Togo) (7.83 MB)

Description This Project Performance Audit Report (PPAR) comprises the Project Performance Audit Memorandum produced by the Operations Evaluation Office and the project completion report produced by the Department of Infrastructure and Industry, North Region (NISI). It focuses on the NANGBETO hydroelectric project for which an ADB loan of UA 22.00 million (loan N° CS/BN/T/PU/83/OO1) was approved In July 1984 in favor of the Governments of Benin and Togo. ADB’s contribution represents l8.8. of the total project cost which had been estimated at UA 117.15 million; the remainder was financed by the IDA, Kuwait Fund, OPEC, BADEA, KFN, CCCE, CIDA, FAC, UNDP and CEB — an Inter—State organization responsible for electric energy production and transportation in the two States.

Download File (7.83 MB)

Multinational: Nangbeto Hydroelectric Dam (Benin/Togo) (7.83 MB)

You are currently offline. Some pages or content may fail to load.