Project Brief - Ghana - TAKORADI II POWER EXPANSION PROJECT

10-Feb-2015

Expansion of the existing 220 MW single cycle gas/fuel oil power plant to 330 MW combined cycle at Takoradi in Western Ghana. The existing plant has been in operation since September 2000. The expansion will use 2 heat recovery steam generators placed in the exhaust path of the gas turbines and is scheduled to deliver power as early as third quarter of 2013.