You are here

Project Brief - Sierra Leone - CECASL HFO Power Project

25-Feb-2016

This power project provides a unique opportunity for the country to address its energy deficit using IPP solution to allow for affordable prices. It consists of the construction and operation of a 50 MW Heavy Fuel Oil (HFO) fired power plant, interconnection facilities and a 1km fuel pipeline in the western area of Freetown, Sierra Leone (“SL”). This is the first phase of three of a planned 128 MW power plant. This project is considering only the first 50 MW, The subsequent two phases will involve implementation of 39 MW each. The fuel will be imported and supplied by an international supplier through a fuel pipeline connecting the jetty and project site