Project Brief - The Buseruka hydropower project - Uganda

25-Sep-2015

The project involves the construction and operation of a hydropower plant in Buseruka located in Hoima District to the West of Uganda. The plant has a capacity of 9 MW. The major component of works involves the construction of: (i) a 150,000 cubic meter capacity dam, (ii) a 1.4Km long power channel and fore bay, (iii), the 1.1 Km long penstock, a power house and the (iv) the electro-mechanical works and (v) a 46Km long 33KV transmission line respectively