You are here

South Africa - Revised Reassessment and Revision of the Terms of Reference for the Compliance Review of the Medupi Power Project - Requests Register N° RQ2010/2

22-Jul-2011

On 21 June 2011, the Boards of Directors met to consider the “Reassessment and Revision of the Terms of Reference for the Compliance Review of the Medupi Power Project, Republic of South Africa” (the “Reassessment”). This Reassessment was prepared by the IRM Roster of Experts and the Director of CRMU (collectively “the IRM”) following the Boards consideration of the Eligibility Report on the Request received in connection with the Medupi Power Project at its meeting on 16 February 2011. At the 21 June 2011 meeting, the Boards of Directors requested the IRM to revise the Reassessment in light of the recorded Highlights of the Boards discussion of 16 February, 2011 and to resubmit revised terms of reference for the compliance review for consideration by the Boards on a lapse-of-time basis.