Tanzania: Mingoyo - Masasi Road Project

Publishing Date 15/01/2014 18:52

Categories: Tanzania, Transport

Download File (2.10 MB)

Tanzania: Mingoyo - Masasi Road Project (2.10 MB)

Description This Post-Evaluation Report (PER) concerns the Mtwara-Mingoyo-Masasi road project located in the Mtwara-Lindi regions of the United Republic of Tanzania. It was financed by the Bank on a parallel basis with the IDA and contributions by the Government. The Bank component, Mingoyo-Masasi (118 km), was financed by the ADB in the sum of UA 4.0 million, with total cost of UA 7.28 million.