Description This abbreviated project performance audit report (PPAR) concerns the Railway Network Improvement Project in Sfax Region. The project, the total cost of which was estimated at UA 22.86 million, was identified and prepared by the SNCFT, and appraised by the Bank in February 1983. Its financing via a UA 11 million loan was approved in June 1984. The loan became effective sixteen months later, and the project was completed on 30 June 1993, eight years behind schedule.