Uganda: Mbale Hospital Rehabilitation Project

15-Jan-2014

The present abridged project performance audit report (PPAR) is a post-evaluation of the Mbale Hospital,Rehabilitation project in Uganda. The project was in keeping with the Uganda Government’s 1996-1989’Investment Programme, whose main objective was to meet the urgent demand of the population for health services which had seriously deteriorated during the civil war. The project was identified by the Government itself. In 1986, the ADF carried out only one mission, to prepare and appraise the project. In March 1987, the Fund approved a loan of UA 3.52 million for its financing. The total project cost amounted to UA 3.90 million. The,loan agreement signed in June 1987, became effective in December 1987. The project was completed in December 1992.