You are here

Uganda - Upgrading Mbale - Bubulo - Lwakhakha Road (44.67 Km) to Bituminous Standard - RAP Report

27-Jan-2014

UNRA’s Mission is “to develop and maintain a national road network that is responsive to the economic development needs of Uganda, to the safety of all road users, and to the environmental sustainability of national roads corridors”. In line with this, the Government of Uganda (GoU) through Uganda National Roads Authority (UNRA) is seeking funding from the African Development Bank (AfDB) to finance the upgrading of Mbale (Bumbobi) - Bubulo – Lwakhakha road to bituminous standards (44.67 km).

Related Sections