The objective of the project is to improve the provision of adequate and reliable power supply in an environmentally sound manner through the rehabilitation of the Hwange Power Plant (HPP) and the power transmission and distribution facilities in the country. The envisaged project is situated in Hwange District within Matebeleland Province. Hwange district lies North West of Harare at the very western part of the country. The district is predominantly a mining district and the area has, in addition to Hwange Power Station, Southern Mining Coke Plant, Hwange Coal Gasification Plant, and Hwange Colliery.