You are here

Environmental & Social Assessments

Displaying 121 - 140 of 867
24-Apr-2019 Benin - Project in Support of the Cotonou Stormwater Drainage Programme (PAPCO) – Summary ESIA
24-Apr-2019 Benin - Project in Support of the Cotonou Stormwater Drainage Programme (PAPCO) – FRAP Summary
24-Apr-2019 Bénin - Projet d’appui au programme d’assainissement pluvial de la ville de Cotonou (PAPCO) - Résumé PCR
24-Apr-2019 Bénin - Projet d’appui au programme d’assainissement pluvial de la ville de Cotonou (PAPCO) - Résumé EIES
23-Apr-2019 Democratic Republic of Congo - Agricultural Value Chains Development Support Project in six provinces of the Democratic Republic of Congo (PADCA-6P) – Summary ESIA and ESMP
23-Apr-2019 Ghana - Access LNG Floating Storage and Regasification Projects (FSU/FRU) - ESIA Summary
01-Apr-2019 Lesotho - Lesotho Highland Water Project Phase II (LHWPII) - Polihali Western Access Corridor - ESIA Summary
01-Apr-2019 Sudan - Water Supply and Sanitation Project in North and South Kordofan – ESMP Summary
01-Apr-2019 Lesotho - Lesotho Highland Water Project Phase II (LHWPII) - Polihali Reservoir & Associated Infrastructure - ESIA Summary
01-Apr-2019 Lesotho - Lesotho Highland Water Project Phase II – RAP Summary
27-Mar-2019 Kenya - KENOL – SAGANA – MARUA Road Project - RAP Summary
27-Mar-2019 South Sudan - Strategic Water Supply and Sanitation Improvement Project (SWSSIP) - ESMP Summary
27-Mar-2019 Kenya - KENOL – SAGANA – MARUA Road Project - ESIA Summary
21-Mar-2019 Sudan - Proposed Solar Powered Pumping Systems for Irrigation Project - ESMP Summary
16-Mar-2019 Sénégal - Construction de l’autoroute côtière Dakar - Saint-Louis - Résumé EIES
16-Mar-2019 Sénégal - Construction de l’autoroute côtière Dakar - Saint-Louis - Résumé PAR
15-Mar-2019 Somalia - Somalia Regional Corridors Infrastructure Programme (SRCIP) – ESIA AND RAP SUMMARY
15-Mar-2019 Somalia - Somalia Regional Corridors Infrastructure Programme (SRCIP) – ESIA Summary
15-Mar-2019 Egypt – Integrated Rural Sanitation in Upper Egypt - Luxor – IRSUE-Luxor – SESA Summary
15-Mar-2019 Côte d’Ivoire - Projet de construction et exploitation de la centrale thermique à gaz de 390MW (CIPREL 5) et de la ligne à haute tension associée, Taboth Côte d’Ivoire – Résumé EIES