You are here

EOI - Multinational - Construction supervision for upgrading of Tanga – Saadani – Bagamoyo Road, Lot 2: Pangani Bridge span including upgrading of approach road, Ushongo Spur Road and Pangani Access Road to bitumen standard - Phase 1

04-Oct-2019

The Government of the United Republic of Tanzania has applied for a Loan from the African Development Fund (ADF) towards the cost of construction of Multinational (Kenya/Tanzania): Bagamoyo – Horohoro/Lungalunga – Malindi Road Project (Phase 1) and intends to apply part of the proceeds of the loans to cover eligible payments for consulting services for construction supervision for upgrading of Tanga – Saadani – Bagamoyo Road (256 Km), Lot 2: Pangani Bridge (525 m) span including upgrading of approach road (14.3 Km), Ushongo Spur Road (5.9Km) and Pangani Access Road (5.4Km) to bitumen standard.

Related Sections