Projects Performance Evaluation Report

Search filters
Egypt - El Arish Power Project
15/01/2014 18:52
Egypt - El Arish Power Project
Ethiopia - Northern Ethiopia Power Transmission Project
15/01/2014 18:52
Ethiopia - Northern Ethiopia Power Transmission Project
This report is a Project Performance Evaluation Report on the Northern Ethiopia Power Transmission Project (NEPTP) located in Northern Ethiopia.Read more
Benin-Togo - Communauté électrique du Bénin (CEB) Energy Production Dispatching and Transport Project - PPER
15/01/2014 18:52
Benin-Togo - Communauté électrique du Bénin (CEB) Energy Production Dispatching and Transport Project - PPER
Multinational (OMVS) Manantali Dam Project
15/01/2014 18:52
Multinational (OMVS) Manantali Dam Project
This Project Performance Audit Report (PPAR) reviews the Arable Lands Development Programme - Phase I Project of the Government of the Republic of Botswana for which an ADB loan equivalent to UA 7.20 million and an ADF loan equivalent to UA 6.17 million (FUA 6.70 million) were approved in October 1981. Other funds were provided by the Government (UA 5.02 million) and IFAD (UA 7.16 million) bringing the planned total project cost to an equivalent of UA 25.55 millionRead more

Categories: Energy & Power, Transport

CAR: M’bali Dam Project
15/01/2014 18:52
CAR: M’bali Dam Project
The present intermediate project performance audit report is on the M’BaIi darn in CAR, for which the ADF granted to the Central African Government, on 23 November 1988, the F/CEF/ELC/88/26 loan of UA 11.10 million.Read more
Zambia: Rehabilitation of Kafue Gorge Hydro - power Station
15/01/2014 18:52
Zambia: Rehabilitation of Kafue Gorge Hydro - power Station
Kafue Gorge Power Station (KGPS), 6 x 150 MW installed capacity represents 56 % of total power installed capacity (1600 MW) of Zambia Electricity Supply Corporation (ZESCO). It was disabled by fire on 26th March 1989 and available capacity in the country was reduced to only 700 MW. This originated losses of foreign exchange revenues from electricity sales to Zimbabwe and power outages for industrial and domestic economic activities. Zambia, formerly power exporter was obliged to import electricity from neighboring Zaire and Zimbabwe.Read more
Ghana: The Electricity Network Reinforcement And Extension To Brong Ahafo Region
15/01/2014 18:52
Ghana: The Electricity Network Reinforcement And Extension To Brong Ahafo Region
This Project Performance Evaluation Report (PPER) is concerned with the performance of the Electricity Network Reinforcement And Extension To Brong Ahafo RegionRead more
Cameroon: Mape Dam Project
15/01/2014 18:52
Cameroon: Mape Dam Project
This full project performance audit report focuses on the Mape dam in Cameroon, based on a study conducted in 1981 by the Cameroonian Government under its energy self-sufficiency policy. The economic and financial study as well as the project presentation note, were prepared by SONEL with the help of a foreign consulting firm.Read more
Botswana: Morupule Power Project
15/01/2014 18:52
Botswana: Morupule Power Project
A pre-feasibility study, whose aim was to meet the growing power demand, in medium term recommended, in March ‘1981, a master plan for the development of the Botswana electrical system up to the year 2000 and, confirming a previous pre-feasibility study, the scaled development of a complete 3 x 30 MW coal-fired power station in Morupule and the interconnection of Shashe (Northern) and Southern divisions, formerly separately operated, before further extensions. Morupule Power Project (MPP) was the first phase of a’ three-staged development aiming at installation of 90 MW in 1988, 90 MW in 1990 in order to reach 420 MW installed capacity by the year 2000.Read more
Tanzania: Rural Electrification Project
15/01/2014 18:52
Tanzania: Rural Electrification Project
OPEV has reviewed the PCR for the above-mentioned project, prepared ‘by the Infrastructure and Industry Department, South Region (SISI) in December, 1 992. Account has been taken of developments since the date of the PCR preparation. Please find below the results of QPEV’s review.Read more
Tunisia: Rural Electrification Project (Electricity IV)
15/01/2014 18:52
Tunisia: Rural Electrification Project (Electricity IV)
The rural electrification project (Electricity IV), is part of a series of actions launched in 1976 by the Tunisian Government and STEG; on the basis of an agreement between the two parties, the Government included in its successive development prograrmmes (Vth and VIth Plans), as a priority, the integrated electrification of the country. Commissioned to implement part of the energy (electricity and gas) component of the plans, STEG carried out the necessary actions which led to the implementation of the following projects co-financed by the Bank: (1) rural electrification of the governorates of Sfax and Gafsa in the south of Tunisia (1978); (2) rural electrification of the governorates of Gabes, Gafsa, Tozeur, Medenine and Tatouine (1981); (3) urban electrification (1984); (4) rural electricity IV (1989), subject of the present abridged audit performance report; (5) rural electricity V (1993).Read more
Senegal: Projet D'electrification Rurale et Urbaine Programme de Redressement Du Secteur Electricite
15/01/2014 18:52
Senegal: Projet D'electrification Rurale et Urbaine Programme de Redressement Du Secteur Electricite
Le présent document constitue le Rapport d'audit de performances (RAPP) du projet d'électrification rurale et urbaine au Sénégal, pour lequel la Banque a approuvé le 26 Août 1986 un prêt de 6,92 millions d'UCF, et du programme de redressement du secteur de l'électricité du Sénégal pour lequel la Banque a également approuvé le 23 Septembre 1986 un prêt de 10,34 millions d'UCF.Read more
Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)
15/01/2014 18:52
Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)
This Project Performance Audit Report (PPAR) comprises the Project Performance Audit Memorandum produced by the Operations Evaluation Office and the project completion report produced by the Department of Infrastructure and Industry, North Region (NISI). It focuses on the NANGBETO hydroelectric project for which an ADB loan of UA 22.00 million (loan N° CS/BN/T/PU/83/OO1) was approved In July 1984 in favor of the Governments of Benin and Togo. ADB’s contribution represents l8.8. of the total project cost which had been estimated at UA 117.15 million; the remainder was financed by the IDA, Kuwait Fund, OPEC, BADEA, KFN, CCCE, CIDA, FAC, UNDP and CEB — an Inter—State organization responsible for electric energy production and transportation in the two States.Read more
Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)
15/01/2014 18:52
Multinational: Nangbeto Hydroelectric Dam (Benin/Togo)
This Project Performance Audit Report (PPAR) comprises the Project Performance Audit Memorandum produced by the Operations Evaluation Office and the project completion report produced by the Department of Infrastructure and Industry, North Region (NISI). It focuses on the NANGBETO hydroelectric project for which an ADB loan of UA 22.00 million (loan N° CS/BN/T/PU/83/OO1) was approved In July 1984 in favor of the Governments of Benin and Togo. ADB’s contribution represents l8.8. of the total project cost which had been estimated at UA 117.15 million; the remainder was financed by the IDA, Kuwait Fund, OPEC, BADEA, KFN, CCCE, CIDA, FAC, UNDP and CEB — an Inter—State organization responsible for electric energy production and transportation in the two States.Read more
Benin: Water And Electricity Supply For Nine District Chief Towns
15/01/2014 18:52
Benin: Water And Electricity Supply For Nine District Chief Towns
This project is part of a vast programme initiated by the Government of Benin in the mid 1970s, aimed at providing secondary centers with adequate water and electricity services. Feasibility and electricity studies for 12 chief towns were completed in August 1981 (on ADF financing). They served as a basis for appraisal of the present project, whose objective was to provide 9 district chief towns with a potable water network designed to provide 30 1/day/hour and an electricity distribution network. The population concerned by the project is made up of 892,235 inhabitants (1992 census).Read more
Burkina Faso: Kompienga Hydro - Electrique Dam Project
15/01/2014 18:52
Burkina Faso: Kompienga Hydro - Electrique Dam Project
Egypt: Shoubrah El Kheima Power
15/01/2014 18:52
Egypt: Shoubrah El Kheima Power
This Project Performance Audit Report (PPAR) reviews the Shoubrah El Kheima Projects (in the following called the Project) in the Arab Republic of Egypt.Read more
Senegal, Mali, Mauritania: Diama Dam Project
15/01/2014 18:52
Senegal, Mali, Mauritania: Diama Dam Project
Morocco: Electricity IV Project
15/01/2014 18:52
Morocco: Electricity IV Project
Mali: Selingue Dam Project
15/01/2014 18:52
Mali: Selingue Dam Project
You are currently offline. Some pages or content may fail to load.