SPN - Cabo Verde - Construction of the Lot 4 – Incubation Center of the Technology Park - Technology Parc Project
13/10/2017
SPN - Cabo Verde - Construction of the Lot 4 – Incubation Center of the Technology Park - Technology Parc Project

Categories: Cape Verde

SPN - Uganda - Design, Supply, and Installation of Medium Voltage networks and last mile consumer connections (Lot-1, Lot-3 & Lot-7) - Rural Electricity Access Project
05/10/2017
SPN - Uganda - Design, Supply, and Installation of Medium Voltage networks and last mile consumer connections (Lot-1, Lot-3 & Lot-7) - Rural Electricity Access Project

Categories: Uganda

SPN – Uganda - Design, Supply, and Installation of Medium Voltage networks and last mile consumer connections (Lot-2, Lot-4 & Lot-5) - Rural Electricity Access Project
05/10/2017
SPN – Uganda - Design, Supply, and Installation of Medium Voltage networks and last mile consumer connections (Lot-2, Lot-4 & Lot-5) - Rural Electricity Access Project

Categories: Uganda

SPN – Somaliland - Supply Water quality laboratory equipment, reagents glassware and other related supplies - Supply Workshop equipment and tools - Water Infrastructure Development for Resilience Project
26/09/2017
SPN – Somaliland - Supply Water quality laboratory equipment, reagents glassware and other related supplies - Supply Workshop equipment and tools - Water Infrastructure Development for Resilience Project
SPN - Prequalification - Multinational - Cote d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project-Rural Electrification Component, Sierra Leone
19/09/2017
SPN - Prequalification - Multinational - Cote d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project-Rural Electrification Component, Sierra Leone

Categories: Energy & Power

AAO – Niger - Acquisition d'équipements pour les stations météorologiques - Projet de Développement de l’Information et de la Prospective Climatiques (PDIPC)
18/09/2017
AAO – Niger - Acquisition d'équipements pour les stations météorologiques - Projet de Développement de l’Information et de la Prospective Climatiques (PDIPC)

Categories: Niger

SPN – Seychelles - Invitation for prequalification for the construction and operation of a 4,400m3/day water treatment plant at La Gogue Dam - Mahe sustainable water augmentation project MSWAP
13/09/2017
SPN – Seychelles - Invitation for prequalification for the construction and operation of a 4,400m3/day water treatment plant at La Gogue Dam - Mahe sustainable water augmentation project MSWAP

Categories: Seychelles

SPN - Ghana - Supply of hardware, software, system integration services and training for the creation of the table office information management system (TOIMS) - GISP
13/09/2017
SPN - Ghana - Supply of hardware, software, system integration services and training for the creation of the table office information management system (TOIMS) - GISP

Categories: Ghana

SPN – Multinational - Supply delivery and installation of ICT equipment and infrastructure - 50 million African women speak networking platform project (50mawsp) - COMESA
12/09/2017
SPN – Multinational - Supply delivery and installation of ICT equipment and infrastructure - 50 million African women speak networking platform project (50mawsp) - COMESA
SPN - Uganda - Improvement of health services delivery at Mulago - Hospital and the city of Kampala project (MKCCAP)
12/09/2017
SPN - Uganda - Improvement of health services delivery at Mulago - Hospital and the city of Kampala project (MKCCAP)

Categories: Uganda, Health

SPN - Rwanda - Rehabilitation, upgrading and extension of water supply network in Kigali City and the Peri – urban areas – WASAC
05/09/2017
SPN - Rwanda - Rehabilitation, upgrading and extension of water supply network in Kigali City and the Peri – urban areas – WASAC

Categories: Rwanda

SPN - Rwanda - Construction of Gihira II water treatment plant and rehabilitation of existing Gihira water treatment plant – WASAC
05/09/2017
SPN - Rwanda - Construction of Gihira II water treatment plant and rehabilitation of existing Gihira water treatment plant – WASAC

Categories: Rwanda

SPN - Swaziland - Construction of Mbabane - Ezulwini Gravity Mains Pipeline - SWSC
05/09/2017
SPN - Swaziland - Construction of Mbabane - Ezulwini Gravity Mains Pipeline - SWSC

Categories: Swaziland

SPN – Uganda - Supply, Delivery, Installation and Commissioning of Linear Accelerator System (LOT 1) and Positioning Aids and Dosimetry Equipment (LOT 2)
25/08/2017
SPN – Uganda - Supply, Delivery, Installation and Commissioning of Linear Accelerator System (LOT 1) and Positioning Aids and Dosimetry Equipment (LOT 2)

Categories: Uganda

SPN – Pre-qualification - Mozambique - Rehabilitation and Upgrading of Road R1251 Roma - Negomano (70 km) in Cabo Delgado Province (Mtwara Development Corridor - Phase 1)
18/08/2017
SPN – Pre-qualification - Mozambique - Rehabilitation and Upgrading of Road R1251 Roma - Negomano (70 km) in Cabo Delgado Province (Mtwara Development Corridor - Phase 1)

Categories: Mozambique

AOI – Madagascar - Travaux de réhabilitation des canaux principaux CP1 et CP2 issus du partiteur d’Ambinanitelo - PRIASO
17/08/2017
AOI – Madagascar - Travaux de réhabilitation des canaux principaux CP1 et CP2 issus du partiteur d’Ambinanitelo - PRIASO

Categories: Madagascar, Infrastructure

AOI – Togo - Acquisition, l’installation et la mise en service de matériels bureautiques pour la communication - Projet d’appui à la gouvernance fiscale - PAGFI
08/08/2017
AOI – Togo - Acquisition, l’installation et la mise en service de matériels bureautiques pour la communication - Projet d’appui à la gouvernance fiscale - PAGFI

Categories: Togo

SPN – Tanzania - Rehabilitation of Water and Sewer Network in Central Business District (CBD) - Arusha Urban Water Supply and Sanitation Authority - AUWSA
08/08/2017
SPN – Tanzania - Rehabilitation of Water and Sewer Network in Central Business District (CBD) - Arusha Urban Water Supply and Sanitation Authority - AUWSA
AOI – Zimbabwe - Supply and Install Telemetry and SCADA for Harare - Urgent Water Supply and Sanitation Rehabilitation Project – Phase II
03/08/2017
AOI – Zimbabwe - Supply and Install Telemetry and SCADA for Harare - Urgent Water Supply and Sanitation Rehabilitation Project – Phase II
IFB – Lesotho - Construction of Tertiary Pipelines and Reticulation Systems in the Maseru District - Construction of Lowlands Rural Water Supply and Sanitation Project
31/07/2017
IFB – Lesotho - Construction of Tertiary Pipelines and Reticulation Systems in the Maseru District - Construction of Lowlands Rural Water Supply and Sanitation Project

Categories: Lesotho