You are here

Zambia - Project Preparatory Study for Development of the Lake Tanganyika Transport Corridor - Project Appraisal Report

31-Jan-2020

The objective the project was to identify specific physical projects for rehabilitation and modernisation of Mpulungu Port in Zambia, analyse technical and economic viability, assess environmental and social impact, and prepare detailed engineering designs and tender documents for implementation under potential funding from the Bank.

Related Sections