Democratic Republic of Congo

19-Jul-2019

GPN - République Démocratique du Congo - Projet Prioritaire de Sécurité Aérienne Phase 2 (PPSA 2)

Le Gouvernement de la République Démocratique du Congo (RDC)  a reçu du Fonds Africain de Développement (FAD) et du Fonds d’Appui à la Transition (FAT) un Don en vue du financement du Projet Prioritaire de Sécurité Aérienne - Phase 2.
16-Jul-2019

Central Africa Regional Integration Strategy Paper 2019 - 2025

This Central Africa Regional Integration Strategy Paper (RISP-CA) proposes a general framework of operations in Central Africa over 2019–2025 for adoption by the Boards of Directors of the African Development Bank (AfDB or Bank) and the African Development Fund. The RISP-CA was prepared within a context of major institutional changes, particularly following the Bank’s adoption of the Development and Business Delivery Model and the continental Regional Integration Strategic Framework for 2018–2025.
15-Jul-2019

GPN - République Démocratique du Congo - Projet d’appui au bien-être alternatif des enfants et jeunes impliqués dans la chaine d’approvisionnement du cobalt (PABEA-COBALT)

Le Gouvernement de la République Démocratique du Congo a reçu de la Banque africaine de développement et du Fonds africain de développement un prêt et des dons en vue du financement du Projet d’appui au bien-être alternatif des enfants et jeunes impliqués dans la chaine d’approvisionnement du cobalt (PABEA-COBALT). Le projet couvre les provinces de Lualaba et du Haut-Katanga en République Démocratique du Congo. Ces deux provinces détiennent plus de 65% de réserve mondiale du cobalt.
28-Jun-2019

DRC – National road no.1 Rehabilitation Project: Kinshasa/Ndjili – Batshamba section - Appraisal Report

The National Road No. 1 (RN1) is the backbone and main transformative highway of the road transport system in DRC. It connects Banana and Matadi ports to major cities in the west of the country, particularly Lubumbashi in the south,to the Zambian border, over about 3,130 km. It mainly serves Kongo Central, Kinshasa, Kwango, Kwilu, Kasaï, Kasaï Central, Kasaï Oriental, Lomami, Haut Lomami, Lualaba and Haut Katanga provinces,which have a huge proportion of the Congolese population. Finally, from Mbuji - Mayiit connects to RN2 which serves Kasongo, Bukavu (South Kivu) and Goma (North Kivu),...
21-Jun-2019

La Banque africaine de développement réaffirme son engagement à soutenir Inga, un projet stratégique pour la RDC et le reste du continent

Le président de la Banque africaine de développement, Akinwumi Adesina, a effectué une visite, mercredi 19 juin 2019, sur le site hydroélectrique Inga, un méga projet d’une capacité totale estimée à 44 000 MW situé à quelque 276 kilomètres au sud-ouest de Kinshasa, en République démocratique du Congo. La Banque a financé pour environ 15 millions USD l'étude de faisabilité pour la poursuite du développement de ce site sur lequel deux premières usines  d’une capacité totale de près de 1800 MW avaient déjà été installées : Inga 1, en 1972, et Inga 2, en 1982. Le gouvernement de la RDC a...
20-Jun-2019

DRC - National Capacity Building Programme Support Project (PANPURC) - PPER

This Project Performance Evaluation Report (PPER) covers the Project to support the DRC’s National Capacity Building Programme t (PANPURC), approved in June 2001 and completed in 2006, which contributed to the implementation of the National Emergency Capacity Building Programme (PNURC), adopted in 1999 by the Government. At appraisal, PANPURC fitted into the political and economic context of the late 1990s, marked by the continuing civil war but also by the start of the peace process. Against this background, no reconstruction project could be effective without capacity building. PANPURC is...
19-Jun-2019

Le chef de l’Etat congolais, Félix Tshisekedi, et le président de la Banque africaine de développement, Akinwumi Adesina, animent un forum sur le secteur privé

Dans le cadre de la visite officielle de quatre jours du président du Groupe de la Banque africaine de développement, Akinwumi Adesina, en République démocratique du Congo (RDC), les opérateurs économiques congolais ont débattu, le 18 juin 2019 à Kinshasa, des opportunités d’investissements. Les secteurs majeurs visés étaient l’agriculture, l’énergie, les mines, l’hydrocarbure, le tourisme et l’éducation. Ils ont également présenté la « vision stratégique » du patronat qui peut se résumer comme suit : diversification économique et mobilisation de ressources. Le président de...
19-Jun-2019

Deuxième jour en RDC du président Adesina : dialogue stratégique avec les membres du gouvernement pour insuffler une dynamique au partenariat

Insuffler une nouvelle dynamique au partenariat bilatéral entre la Banque africaine de développement et la République démocratique du Congo (RDC), et explorer des pistes susceptibles de renforcer la croissance économique du pays. Tels sont les deux objectifs du dialogue stratégique organisé entre la Banque et les membres du gouvernement congolais (Ministres des finances, du budget, de l’agriculture, des PME, de l’énergie, du transport, des mines, du plan, de la santé et du développement rural), à l’Hôtel-Fleuve-Congo, à Kinshasa. Se félicitant de la contribution de la Banque africaine de...
18-Jun-2019

RDC : Première journée de la visite officielle du président Adesina, dépôt de gerbe de fleurs, rencontre avec la presse

Le président de la Banque africaine de développement, Akinwumi Adesina, est arrivé à Kinshasa dans le cadre d’une visite officielle de quatre jours, à l’invitation du président de la République démocratique du Congo (RDC), Félix Tshisekedi. La délégation de la Banque a été chaleureusement accueillie par les autorités. Adesina était accompagné, pour la circonstance, de l’administrateur pour la RDC, René Obam Nlong, du directeur général de la Banque africaine de développement pour l’Afrique centrale, Ousmane Doré, du directeur général adjoint, Racine Kane, du responsable-pays p.i, Akoupo...
17-Jun-2019

DRC - Project to protect and rehabilitate RN1 between Kinshasa/N'djili–Batshamba – Summary ARAP

This document summarises the Abbreviated Resettlement Action Plan (ARAP) of the Project to Protect and Rehabilitate RN1 between Kinshasa/N'djili–Batshamba. This first national highway rehabilitation project along the Kinshasa-Batshamba segment extends from Nsele bridge (PK615+00) to Batshamba (PK1.238+00). It is located in the Democratic Republic of Congo (DRC), within the central economic zone retained in the Bank's Country Strategy Paper.
17-Jun-2019

The President of the African Development Bank begins an official visit to the Democratic Republic of Congo from June 17 to 20, 2019

The President of the African Development Bank, Dr. Akinwumi Ayodeji Adesina and a delegation begin a four-day official visit to the Democratic Republic of Congo (DRC), at the invitation of President Felix Antoine Tshisekedi Tshilombo. During the visit, intended to strengthen the bilateral partnership between the Bank Group and the DRC, Adesina will meet with the Congolese Head of State and discuss development issues. The strategic dialogue between the Bank and Congolese public and private institutions will also be at the heart of Adesina's very first official visit to the Central...
12-Jun-2019

African leaders share their vision for an integrated continent

Leaders from four African countries on Wednesday shared their vision for an integrated and borderless Africa that would foster economic growth and development. The leaders spoke during a high-level presidential dialogue on day two of the African Development Bank’s 2019 Annual Meetings. The panelists – President Teodoro Obiang Nguema Mbasogo of Equatorial Guinea, President Felix Tshsekedi of the Democratic Republic of Congo, the Prime Minister of eSwatini Ambrose Mandvulo Dlamini and his majesty King Letsie III of Lesotho – were joined by African Development Bank President Akinwumi...
12-Jun-2019

“To integrate Africa, bring down the walls,” Adesina urges at 2019 African Development Bank Annual Meetings Open in Malabo

African leaders on Wednesday underscored the urgent need to fast-track the continent’s regional integration process in order to accelerate Africa’s economic transformation. The call was made at the opening ceremony of the Bank’s 2019 Annual Meetings, in Malabo, Equatorial Guinea, with the theme: “Regional Integration for Africa’s Economic Prosperity.” “Apart and divided, Africa is weakened. Together and united, Africa will be unstoppable,” the Bank’s President Akinwumi Adesina told delegates at the packed Sipopo Conference Center. Adesina urged African governments to work toward...
05-Jun-2019

DRC – Project to Support the Development of Agricultural Value Chains in Six Provinces in DRC (PADCA-6P) - Appraisal report

the African Development Bank-funded Project to Support the Development of Agricultural Value Chains in Six Provinces in the Democratic Republic of Congo (PADCA-6P) aims to sustainably improve food and nutrition security and increase the incomes of the target population. PADCA-6P will be implemented over a five-year period (2019-2024) for a total cost of UA 22.153 million in the provinces of Kwilu, Kasaï, Haut Iomami, Iomami, Maniema, and Tshopo. It will target some 1,768,825 rural households, 60% of which are women, with 8,394,125 direct beneficiaries, and build knowledge for the rural world...
20-May-2019

Attribution de marché – Multinational - Interconnexion des réseaux électriques de Larca et de la RDC à partir du système hydroélectrique de Boali phase 1, Composante RDC

17-May-2019

DRC - Project to protect and rehabilitate the RN1 between Kinshasa/Ndjili – Batshamba – Summary ESMP

This first national highway rehabilitation project along the Kinshasa-Batshamba segment extends from Nsele Bridge (PK615+00) to Batshamba (PK1.238+00). It is located in the Democratic Republic of Congo (DRC), within the central economic zone retained in the Bank's Country Strategy Paper. The aim of protecting and rehabilitating this road section is to improve and maintain the level of road transport services between Kinshasa/Ndjili and Batshamba, thereby ensuring the effective continuation of the gradual rehabilitation of RN1 linking Matadi to Lubumbashi. The works to be carried out under the...
17-May-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PGES

Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du maintien du niveau de service entre Kinshasa/N’djili et Batshamba, afin de garantir la poursuite réelle de la réhabilitation progressive de la RN 1 qui relie Matadi à...
17-May-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PARA

Le présent document résume le Plan d’action de réinstallation abrège (PARA) du Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa-N’Djili-Batshamba. Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du...
09-May-2019

RDC - Semi-Urban and Rural Electrification Project - ESMP Summary

DRC has the 4th hydro-electric power potential in the world, with 600 billion KWH and about thirty power stations mainly located in Katanga, in the eastern part of the country, and in BasCongo. Nearly 2.5% of this potential is currently tapped. Electricity is generated by the national utility, the National Electricity Corporation (SNEL), which is the only official operator in the electric power sector. Despite this potential, the obsolete installations and the low equipment rate are such that the current electrification rate is only about 1% in rural areas, 30% in urban areas, and a national...
23-Apr-2019

Democratic Republic of Congo - Agricultural Value Chains Development Support Project in six provinces of the Democratic Republic of Congo (PADCA-6P) – Summary ESIA and ESMP

This Environmental and Social Impact Assessment was conducted with support from the African Development Bank (AfDB) as part of the appraisal mission of the Agricultural Value Chains Development Support Project in the DRC’s six Provinces (PADCA-6P). PADCA-6P, an initiative of the Government of the Democratic Republic of Congo and financed by the African Development Bank, seeks to contribute to the long-term improvement of food and nutritional security and to increase the incomes of the target communities. PADCA-6P operations, expected to span a period of five years (2019-2024) and cost a total...