23-Feb-2015
PPM - Egypt - CTF Project Preparation Grant for 200MW Wind Farm in the Gulf of Suez – CTF – 02 2015
PPM - Egypt - CTF Project Preparation Grant for 200MW Wind Farm in the Gulf of Suez – CTF – 02 2015
The Board of Directors of the African Development Bank (AfDB) approved on Wednesday, May 20, 2015, a loan of US $70.5 million to finance the Tanzania Power Sector Reform and Governance Support Programme (PSRGSP). The objective of the operation is to promote inclusive growth and enhanced economic...
The African Development Bank (AfDB), the ECOWAS Centre for Renewable Energy and Energy Efficiency (ECREEE), and the United States-based National Renewable Energy Laboratory (NREL) have formed a partnership centered on linking gender and energy access.
The three have jointly organised an...
The African Development Bank (AfDB) has published a new economic paper on the Middle East and North Africa, entitled "Trade Volume and Economic Growth in the MENA Region: Goods or Services?"
In this paper, the African Development Bank underlines that the relatively high trade barriers in the...
Expansion of the Azito power plant in Côte d'Ivoire, by converting the existing simple-cycle power plant of 2 x 144 MW gas-fired turbines to a combined-cycle power plant, thereby increasing the capacity of the facility to approximately 430 MW.
Expansion of the existing 220 MW single cycle gas/fuel oil power plant to 330 MW combined cycle at Takoradi in Western Ghana. The existing plant has been in operation since September 2000. The expansion will use 2 heat recovery steam generators placed in the exhaust path of the gas turbines and is...
Construction and operation of an 87 MW thermal power plant located on land owned by The Kenya Power and Lighting Company Limited (“KPLC”) in the Athi River region 35 km from Nairobi. The plant comprises 5 heavy fuel oil generators that can be converted to natural gas if gas becomes available, and a...
To add 300 MW to power generation capacity and will benefit Kenya by providing clean and affordable energy that will reduce the overall energy cost to end consumers. Furthermore, the project will allow the landlocked Great Rift Valley region to be connected to the rest of the country through the...
The project consists of the construction and operation of a 1.4 MTPA gas to urea fertilizer plant to be located in Port Harcourt, River State, Nigeria. Other project components will include: (i) a 84 km pipeline; and (ii) a multipurpose jetty and terminal infrastructure at Onne Port (16km...