Placé sous l’autorité du Coordonnateur du Projet, et tout en collaborant avec les spécialistes du projet, le responsable en suivi-évaluation sera chargé de synthétiser l’avancement du projet en tenant compte des questions financières, de passations des marchés, et l’avancement des activités ; le...
Audit annuel des acquisitions du Projet de transformation agro-alimentaire du Togo (PTA-TOGO) pour les exercices 2022, 2023 et 2024
Audit annuel des comptes du Projet de transformation agro-alimentaire du Togo (PTA-TOGO) pour les exercices 2022, 2023 et 2024
The Kingdom of Lesotho has received Financing from the African Development Fund in various currencies towards the cost of Lesotho Lowlands Water and sanitation Development Project Phase III, it is intended that part of the proceeds of this loan will be applied to eligible payments under the...
The principal objectives of this project are to:
to increase the transmission system capacity of Eastern Ethiopia Electricity Grid from the current 70 MW to 360 MW. This is achieved by reinforcing the existing 132 kV transmission system that supplies power to Harar, Jijiga, Degehabur, and...
The project includes: (i) construction of 158 km of 400 kV transmission lines, initially to be operated at 230 kV level, from Hurso to Jijiga through Harar substation, (ii) construction of 206 km single circuit 132kV transmission lines from Deghabur to Kebridehar through Birkot, 2.77 km double...
20-Apr-2023
GPN - Rwanda - EAC Multinational (Rwanda/Burundi) Cross Border Roads Upgrading Project - Phase 1
The project development objective is to improve transport connectivity between Burundi and
Rwanda by upgrading of missing links on the Central and Northern Corridors in both countries. This will in turn strengthen regional integration and trade in EAC Region, particularly between Rwanda and...
Les services prévus au titre de ce contrat comprennent : (i) Etudes topographiques et bathymétriques ; (ii) Etude du phénomène d’érosion lacustre des berges ; (iii) Etude hydrogéologique et de glissement de terrain ; (iv) Etudes géotechniques et recherche de matériaux de construction ; (v) Etude...
The objective of the assignment is to acquire the services of individual consultants with required qualifications/competences for the following assignments tenable at the IGAD Headquarter in Djibouti to set up the core team of the Project Implementation Unit (PIU):
Coordinator, Head of PIU...
