This Project Performance Evaluation Report (PPER) is a post-evaluation of the Four Centers Water Supply Project and Maseru II Water Supply Project both in the Kingdom of Lesotho. The total project cost for the Four Centers was estimated at UA13.23 million (to be covered by an ADF loan of UA6.08...
15-Jan-2014
Malawi - District Water Supply Phase II Project and Mpira-Balaka Rural Water Supply Project - PPER
This project performance evaluation report is concerned with the performance of the Mpira-Balaka Rural Water Supply and the District Water Supply Phase II Projects in Malawi.
The Mpira-Balaka Rural Water Supply and the District Water Supply Phase II projects were financed by ADF, TAF, DANIDA and...
This Project Performance Evaluation Report (PPER) is a post-evaluation of the Five Urban Centres Water Supply and Sewerage Rehabilitation Project in the Republic of Uganda. The total cost of the project was estimated at UA15.97 million (FUA17.34 million) to be covered by an ADF loan of UA 13.81...
The Bauchi Township Water Supply Project of the Federal Republic of Nigeria was completed in 1992 and a Project Completion Report (PCR) was prepared in 1994. The PCR included a detailed analysis and discussion of all the project implementation aspects. The project was also selected for the thematic...
15-Jan-2014
Ethiopia - Review of Bank Group Assistance to the Public Utility Sector - Evaluation Report Summary
Public Utility Sector
Effective policies, strategies and institutional arrangements are most critical for performance of the sector and for a lasting development impact. The Bank’s sectoral level assistance and association with the Government in policies, strategies and institutional development...
The Operations Evaluation Department (OPEV) conducted an evaluation of the Bank’s assistance to AWM covering the period 1990-2010, with particular focus on Ghana and Mali. The evaluation examined past experiences, drew lessons, and formulated recommendations to inform and guide the Bank’s future...