P-KE-FF0-001

Project Details
ID: P-KE-FF0-001 Name: KOPERE 40 MW SOLAR PV IPP Status: Approved Country: Kenya
Sector: Power Approval date: 27-Nov-2018 Task Manager: JAKOET Jasmin, PESR2
Total cost: 63920000
Currency: UAC
Source(s) of financing
AfDB: 13113547.3
Cofinanced: 33018425.36
Implementing Agency: Kopere Solar Park Ltd Location: Kenya

Description

Design, construction and operation of a 15MW PV Project in Kisumu District, Kenya, 5 Km from the center of Kopere on Kopere-Kimwani Road (The Project). The plant will be connected to the national grid through evacuation lines of 15 km as part of the Project. The Project is scheduled for starting construction by the end of December 2014

16-Jan-2019

Project Summary Note - Kopere 40 Mw Solar Pv Ipp

Design, construction and operation of a 50 MWp (40 MWac net capacity) solar PV power project, 5 km from the center of Kopere in Nandi County (‘the project’). The project involves the construction of a 33/132 kV substation and a 1.8 km T-line to evacuate the electricity to the national grid via an existing 132 kV high voltage network operated by KPLC, under a 20-year ‘take or pay’ PPA.