Project Details
ID: P-SN-C00-003 Name: AMENAGEMENT TOURISTIQUE BASSE CASAMANCE Status: Completed Country: Senegal
Sector: Environment Approval date: 14-Oct-1975 Task Manager: HEEROO Hemchand Rai, OINF3
Total cost: 400000
Currency: UAC
Source(s) of financing
Implementing Agency: --

Objectives

1. overall objective : carry out a feasibility study for the development of hydroelectric projects for providing cheap and reliable power to the economy. 2. Specific objectives : determine the techno-economic feasibility of developing hydropower stations at Roseires, Sennar and Jebel Aulia Dams.

Description

1. overall objective : carry out a feasibility study for the development of hydroelectric projects for providing cheap and reliable power to the economy. 2. Specific objectives : determine the techno-economic feasibility of developing hydropower stations at Roseires, Sennar and Jebel Aulia Dams.

Benefits

1. overall objective : carry out a feasibility study for the development of hydroelectric projects for providing cheap and reliable power to the economy. 2. Specific objectives : determine the techno-economic feasibility of developing hydropower stations at Roseires, Sennar and Jebel Aulia Dams.

Rational

1. overall objective : carry out a feasibility study for the development of hydroelectric projects for providing cheap and reliable power to the economy. 2. Specific objectives : determine the techno-economic feasibility of developing hydropower stations at Roseires, Sennar and Jebel Aulia Dams.

P-SN-C00-003