P-SO-DB0-001

Project Details
ID: P-SO-DB0-001 Name: BERBERA-HARGEISA ROAD PROJET (ADB) (P) Status: Completed Country: Somalia
Sector: Transport Approval date: 20-Oct-1971 Task Manager: RAO Duddu Rama, OINF2
Total cost: 1200000
Currency: UAC
Source(s) of financing
AfDB: 690000
Government: 510000
Implementing Agency: --

Objectives

The main activities under the main study which was completed in 1991 were: 1. Geology and Ore reserves; 2. Mining (expansion of the Mine by mining the central and Upper Legadembi deposits); 3. Process Plant(crushing,grinding, thickening & leaching, CIP, treatmentand gold recovery); 4. Laboratory (areas to be examined); 5. Maintenance (preventive, plant monitoring,facilities e.g workshops & equipment, procurement of spares etc); 6. Tailingsdam; 7. Organisation and Management; 8. Financail and commercial Aspects; The debottlenecking study comprises of two stages: 1. Satge I: Basic enginering: The activities (evalaution of existing mine and plant oprations), under this stage have been completed. 2. StageII: Detailed Engineering. This activity is still outstanding.

Description

The main activities under the main study which was completed in 1991 were: 1. Geology and Ore reserves; 2. Mining (expansion of the Mine by mining the central and Upper Legadembi deposits); 3. Process Plant(crushing,grinding, thickening & leaching, CIP, treatmentand gold recovery); 4. Laboratory (areas to be examined); 5. Maintenance (preventive, plant monitoring,facilities e.g workshops & equipment, procurement of spares etc); 6. Tailingsdam; 7. Organisation and Management; 8. Financail and commercial Aspects; The debottlenecking study comprises of two stages: 1. Satge I: Basic enginering: The activities (evalaution of existing mine and plant oprations), under this stage have been completed. 2. StageII: Detailed Engineering. This activity is still outstanding.

Benefits

The main activities under the main study which was completed in 1991 were: 1. Geology and Ore reserves; 2. Mining (expansion of the Mine by mining the central and Upper Legadembi deposits); 3. Process Plant(crushing,grinding, thickening & leaching, CIP, treatmentand gold recovery); 4. Laboratory (areas to be examined); 5. Maintenance (preventive, plant monitoring,facilities e.g workshops & equipment, procurement of spares etc); 6. Tailingsdam; 7. Organisation and Management; 8. Financail and commercial Aspects; The debottlenecking study comprises of two stages: 1. Satge I: Basic enginering: The activities (evalaution of existing mine and plant oprations), under this stage have been completed. 2. StageII: Detailed Engineering. This activity is still outstanding.

Rational

The main activities under the main study which was completed in 1991 were: 1. Geology and Ore reserves; 2. Mining (expansion of the Mine by mining the central and Upper Legadembi deposits); 3. Process Plant(crushing,grinding, thickening & leaching, CIP, treatmentand gold recovery); 4. Laboratory (areas to be examined); 5. Maintenance (preventive, plant monitoring,facilities e.g workshops & equipment, procurement of spares etc); 6. Tailingsdam; 7. Organisation and Management; 8. Financail and commercial Aspects; The debottlenecking study comprises of two stages: 1. Satge I: Basic enginering: The activities (evalaution of existing mine and plant oprations), under this stage have been completed. 2. StageII: Detailed Engineering. This activity is still outstanding.