You are here

Procurement

The fiduciary responsibility in its charter requires the African Development Bank to ensure that the proceeds in the projects and programs financed by it are used only for the purposes for which they were granted. The charter also requires that proper attention be paid to economy and efficiency in the procurement processes in Bank funded projects. Accordingly, the Bank prefers the most open competitive procedures for procurement of goods, works and services. Political and other non-economic influences or considerations must not influence procurement in Bank financed projects. The procurement procedures should give fair and equal opportunity to contractors, suppliers and consultants from member countries of the Bank. Transparency is also essential in the procurement process.

The Bank has developed Rules and Procedures for Procurement of Goods and Works and Rules and Procedures for Recruitment of Consultants that govern Bank financed procurement. To assist borrowers, the Bank has, in collaboration with other Multilateral Development Banks, also developed Standard Bidding Documents that should be used for contracts financed by the Bank.

As a part of its development mandate, the Bank is equally active in supporting the development and reform of public procurement systems in borrower countries. As the expenditure through public contracts is a sizeable portion of Government expenditure, increased efficiency, fairness, transparency and equal opportunity are critical for sustainable development and poverty reduction. 

Displaying 3221 - 3240 of 6397
24-Sep-2021 AON - RCA - Construction des latrines publiques, aires de séchage des produits agricoles et bassins de rouissage des maniocs - PSEPA
24-Sep-2021 AMI - Tunisie - Elaboration de la stratégie d’intégration économique régionale de la BMICE 2022-2026 - BMICE
24-Sep-2021 EOI - Tunisie - Development of the regional economic integration strategy of the BMICE, 2022-2026 - BMICE
24-Sep-2021 EOI - Tunisia - Carrying out of an internal organization study for the optimization of human resources (Establishment of the organizational model of BMICE)
24-Sep-2021 PPM - RDC - Projet de Développement des Compétences et des Ressources Humaines (PDCRH)
23-Sep-2021 Contract Awards - Development of the Knowledge Hub of the Financial Modeling for the Extractive Sector (FIMES) project in Transitional Countries in Africa - ECNR
23-Sep-2021 PPM - Multinational - Projet d’Appui à l'Approfondissement du Secteur Financier en Afrique Centrale (PASFIC)
23-Sep-2021 IFB - Bénin - Acquisition de robinets d’équerre inviolables - PRPES
23-Sep-2021 SPN - Ghana - Supply and Delivery of 25 No Skip Trucks for the MMAs - GASSLIP
23-Sep-2021 AMI - Burkina Faso - Réalisation de l’audit des acquisitions du Projet d’Aménagement et de Valorisation de la plaine de la Léraba - PAVAL
22-Sep-2021 PPM - Cameroun - Aménagement de la route Batchenga-Ntui-Yoko-Lena
22-Sep-2021 PPM - Cameroun - Réhabilitation de la route Yaounde - Bafoussam - Babadjou et aménagement des routes Grand Zambi-Kribi et Bogo-Pouss
22-Sep-2021 PPM - Cameroun - Construction de la Ring Road
22-Sep-2021 Attribution de marché - Tunisie - Mise en place d’un "PROJECT MANAGEMENT OFFICE" (PMO) au Sein du Ministère chargé de la Formation Professionnelle et de l’Emploi
22-Sep-2021 SPN - Angola - Design and Construction of Power Lines to San Vicente Agricultural Station and Fingerlings Production Center - CPAVCDP
22-Sep-2021 PPM - Cameroun - Projet d'Etudes et de Préparation d'un Programme d'Approvisionnement en Eau Potable et d'Assainissement en Milieu Rural
22-Sep-2021 PPM - Cameroun - Construction du pont sur la Logone entre Yagoua (Cameroun) et Bongor (Tchad)
21-Sep-2021 AAO - Tunisie - Aménagement du système global de télétransmission et de téléconduite du réseau de transport de la STEG
21-Sep-2021 AMI - Guinée - Réalisation de l’audit environnemental et social du projet d’interconnexion électrique 225 kV Guinée - Mali (PIEGM)
20-Sep-2021 AMI - Togo - Elaboration des études APD et DAO pour les trois barrages et deux périmètres irrigués (B4, B5 et B6/B7) - PTA-TOGO