Context

Today, nearly 2.5 million of the country's 23 million inhabitants reside in the Cameroonian capital of Yaoundé – over 60% of which is covered by low income settlement housing. The Mfoundi Canal, the city's main drainage system, has with time become a receptacle for household refuse, industrial waste, domestic and industrial sewage and excreta from uncontrolled housing areas. This waste accumulates at the top end of the underground canals and its effluents, obstructing the normal flow of runoff water.

As a result, the nearly 2,000 millimetres of water which falls annually during the rainy season causes severe flooding, leading to loss in income-generating activities, the destruction of homes and businesses, an increase in waterborne diseases, and environmental degradation such as soil erosion.

Adapting Yaounde's drainage system to improve climate resilience, health and create jobs

Project snapshot

Country : Cameroon
Sector : Water and sanitation
AfDB and related financing: ADF grant USD 36.4 million (Phase I); ADF loan USD 30 million GEF grant of USD 4 million (Phase II)

Outputs:

  • construction of a 3.5 kilometre canal on the Mfoundi river bed (Phase 1)
  • construction of a 6-km long drainage canal along the Mfoundi river's main bed, two towpaths and crossings, four 8-km long drainage canals along the tributaries (Phase 2 expected output)
  • domestic waste sludge disposal and treatment plant, landscaping around the main canal, enhancing vector control capacity of area health centers, capacity building for the Yaoundé City Council and seven District Councils. (Phase 2 expected output)

Objectives

Objective

Since 2005, the AfDB, in partnership with the Government of Cameroon, the French Agency for Development and the Global Environment Facility, has been working to limit the effects of floods that disrupt the capital's socio-economic activities, mostly within the less-affluent settlement areas. Related activities, such as landscaping and pre-disposal of solid waste, have also been introduced to further improve the living conditions of Yaoundé's 1.8 million people, almost half of whom are women

Key Facts

  • The infrastructure created under the first phase of the project – a 3.5-km canal on the Mfoundi river bed, out of a total length of 17.5 km, including four tributaries – has become a reference for future sanitation projects in Yaoundé.
  • This project will further help build the institutional and logistical capacity of the Yaoundé City Council to enable it to properly ensure the upkeep and maintenance of the city's drainage system to avoid repeat flooding.

Impact

  • reduction in annual frequency of floods caused by the Mfoundi from 15 to three times between 2006 and 2011 (Phase 1)
  • reduction in prevalence of water-borne diseases caused by frequent floods (malaria, typhoid and diarrhea) by 47%, 47% and 36%, respectively, during the period 2007 -2011 (Phase 1)
  • decrease in prevalence of waterborne diseases in proportions estimated as follows: from 11.84% to 5% for malaria; from 2.7% to 1.05% for diarrhea; from 3.06% to 0.5% for typhoid fever (Phase 2 expected impact)
  • creation of almost 2,500 jobs (2,130 temporary and 370 long-term jobs) (Phase 2 expected impact)

The infrastructure created under the first phase of the project – a 3.5-km canal on the Mfoundi river bed, out of a total length of 17.5 km, including four tributaries – has become a reference for future sanitation projects in Yaoundé. This project will further help build the institutional and logistical capacity of the Yaoundé City Council to enable it to properly ensure the upkeep and maintenance of the city's drainage system to avoid repeat flooding.

Lessons learned

Four major lessons were learned following completion of the first phase of the project, which were in turn taken into consideration during phase two of the project.

First, enhancing public awareness in addition to the capacity of various stakeholders was critical to the success of the first phase to halt the significant quantities of waste and debris, which were being transported by stormwater drainage channels due to flooding and poor waste management practices. Raising public awareness on solid waste management and neighbourhood association intervention in sanitation and solid waste pre-collection reduced the dumping of waste in stormwater drainage channels, and thus improve water quality Mfoundi and its tributaries.

Second, implementation of a solid waste collection strategy is indispensable to the realization of a sanitation master plan. Failure to update a stormwater component, for example, is likely to result in suboptimal success of such a master plan and dampen the vision of the sanitation subsector. 

Project quality at project inception is also key because without investigations into local company capacities some activities like paved walking trails, planted trees, and landscaped gardens become difficult to implement.

Lastly, it is imperative to build the capacity of project implementing structures, especially those related to procurement. If this is not done, the project implementation schedule will not be respected because of delays in procurements activities.