Plans de réinstallation abrégés

17-mai-2019

Multinational : Malindi - Lunga Lunga/Tanga - Bagamoyo Road Corridor Development – RAP Summary for the proposed upgrading of Mombasa - Mtwapa - Kwa Kadzengo - Kilifi (A7) Section , Kenya

The Government of the Republic of Kenya, through its implementing agency, the Kenya National Highways Authority (KeNHA) and support of the African Development Bank (AfDB) is undertaking review of the Mombasa-Mtwapa-Kadzengo-Kilifi (55 Km)Section of the A7 Highway which previously underwent Feasibility Study and Detailed Design as part of the Multi-national Lunga Lunga-Mombasa-Malindi (A7) Road Project. Towards this, KeNHA commissioned a consortium led by Uniconsult Engineering Consultants Ltd to undertake the Consultancy Service for Review of the Feasibility Study, Environmental and Social...
17-mai-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PARA

Le présent document résume le Plan d’action de réinstallation abrège (PARA) du Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa-N’Djili-Batshamba. Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du...
14-mai-2019

Niger - Projet d’aménagement et de bitumage de la route Tamaske-Kalfou-Kolloma y compris la bretelle de Tamaske-Mararraba (63 Km) – Résumé PAR

Le présent document résume le Plan d’Action de Réinstallation du projet d’aménagement et de bitumage de la route Tamaské-Kalfou-Kolloma y compris la bretelle de Tamaské-Mararraba (63 km) dans la région de Tahoua. Ce projet s’inscrit dans le cadre du Programme de la Renaissance acte 2 du gouvernement de la République du Niger, à travers lequel un Plan de Développement Économique et Social (PDES) 2017-2021 a été élaboré et adopté le gouvernement. Ce PDES prend en compte les projets et programmes prévus par la Stratégie Nationale des Transports en vue de renforcer et préserver le réseau routier...
13-mai-2019

Mozambique - Projet de route Roma-Ngapa, Phase II – Résumé PAR / EIES

Le gouvernement du Mozambique, par l’intermédiaire de l’Administration nationale des routes (Administração Nacional de Estradas ou ANE) prévoit d’utiliser les fonds de la Banque africaine de développement (BAD) pour réhabiliter la route N381/2151 de Mueda à Roma sur 95 km, dans le district de Mueda, situé dans la province de Cabo Delgado au nord du Mozambique. La route visée par le projet fait partie du Corridor de Mtwara, tel que défini dans le Protocole de la SADC.
01-avr-2019

Lesotho - Projet de mise en valeur des ressources en eau des hauts plateaux – Phase II – Résumé PAR

Alors qu’elle avait germé dès le milieu des années 1950, l’idée de transférer de l’eau du Lesotho vers l’Afrique du Sud s’est concrétisée en 1986 avec la signature du Traité relatif au Projet de mise en valeur des ressources en eau des hauts plateaux du Lesotho conclu entre les gouvernements du Royaume du Lesotho et de la République d’Afrique du Sud. Le traité a créé le Projet de mise en valeur des ressources en eau des hauts plateaux du Lesotho (LHWP) pour détourner les eaux du bassin de la rivière Senqu au Lesotho vers le cours supérieur de la rivière Vaal en Afrique du Sud en aménageant...
29-jan-2019

Multinational - Ethiopia – Djibouti Transport Corridor Project Phase I – RAP Summary

The proposed Adama-Melka Jilo (60km) Expressway is a continuation of the existing Addis Ababa- Adama expressway and part of the planned Adama-Dire Dawa Expressway project, which has been designed in recognition of the high level of congestion on the existing Addis Ababa – Djibouti road. A large portion of the traffic on this road are heavy loaded trucks transporting import and export goods. The project is located in the central eastern part of Ethiopia, within the corridor of the existing Addis Ababa – Adama – Awash – Djibouti trunk road, and traverses 3 districts of Oromia and Amhara...
28-jan-2019

Malawi - Projet de développement du corridor routier de Nacala – Phase IV (Tronçon Nsipe – Liwonde) – Résumé EIES/PAR

Le gouvernement du Malawi, à travers l’Office des routes, avec le financement de la Banque africaine de développement se propose de réhabiliter la route Nsipe – Liwonde (Mangochi Turn-Off) en vue d’en faire une route régionale principale (RRP), intégrée au corridor routier de Nacala. Couvrant une distance de 55 kilomètres (km), le projet routier part de Nsipe (route M1) à Chingeni sur la route M1 et de Chingeni, il continue vers Mangochi Turn-Off, sur la route M3. La route comportera une chaussée de 7 mètres (m) et des accotements revêtus d’un mètre des deux côtés et sera construite sur une...
11-jan-2019

Niger - Projet d’appui au programme "Kandadji" de régénération des écosystèmes et de mise en valeur de la vallée du Niger (P_KRESMIN) – Résumé PAR 2A

Le présent document résume le Plan d’action de réinstallation de la seconde phase (PAR 2A) du Projet d’appui au Programme Kandadji de régénération des écosystèmes et de mise en valeur de la vallée du Niger. En effet, le programme Kandadji a, dans le cadre de la première phase, préparé et exécuté un plan de réinstallation pour le déplacement des personnes affectées par la construction du site du barrage (PAR 1). Pour cette première phase, certains travaux préparatoires ont été exécutés : la construction du pont provisoire, la construction de la cité du maitre d’ouvrage et la protection des...
03-déc-2018

Tanzania - Proposed Upgrading of the Dodoma City Outer Ring Road (110.2km) To Bitumen Standard, Dodoma Region – Rap Summary

The Government of the United Republic of Tanzania with the assistance from African Development Bank (AfDB) intends to upgrade the Dodoma City Outer Ring Road (110.2 km). The project is being implemented by Tanzania Roads Agency (TANROADS). TANROADS is an Executive Agency under the Ministry of Works, Transport, and Communication; established under the Executive Agencies Act in 2000, with the duty of maintaining and developing trunk and regional road network in Tanzania Mainland. In broad terms, improvement will involve a construction of new road. The rehabilitation and/or replacement of...
28-nov-2018

Nigeria - Ebonyi State Ring Road - RAP Summary

The Ebonyi state government proposes to borrow the total sum of $150 million from the African Development Bank (ADB) and Islamic Development Bank (IsDB) for the reconstruction/ rehabilitation of the 198 km existing Abakaliki Ring Road into a standard one carriageway, 2 - lane road finished with asphalt over lay over the road pavement. The pavement substratum is designed to have a compacted sub soil layer preferably of laterite. This layer is expected to be the stable bed on which the road pavement is carried. The Abakaliki Road Project, otherwise known as the State Ring Road Project, will...
22-nov-2018

Zambia-Zimbabwe-Botswana-Namibia Interconnector (ZiZaBoNa) – Phase A – ARAP Summary

The ZIZABONA transmission project consists of the development, financing, construction and operation of new transmission facilities in Zambia and Zimbabwe, Botswana and Namibia with the view to facilitate the establishment of a western transmission corridor in Southern Africa. The project derives its name from the first two letters of each of the four countries involved. The electricity utilities of Zimbabwe, Zambia, Botswana and Namibia signed an Inter-Utility Memorandum for the development of the transmission network called ZIZABONA in 2007, and an Inter-Governmental Memorandum of...
12-oct-2018

Bénin - Projet de construction de la centrale thermique 145MW à moteurs dual fuel (GAZ-HFO) sur le site de MARIA-GLETA 2 - Résumé du cadre social et le processus d’acquisition de terre

Le présent document constitue le résumé du processus d’acquisition de terre du projet de la construction de la centrale thermique de Maria Gléta au Bénin. Une Etude d’Impact Environnemental et Social (EIES) qui inclut un Plan de Gestion Environnemental et Social (PGES) a été réalisée par TRACTEBEL pour le compte du Gouvernement du Bénin (2017) et un Certificat de Conformité a été délivré par l’Agence Béninois de l’environnement (ABE) le 11 Avril 2017. Afin d’attribuer l’EIES aux exigences des organisations prêteuses, une mise à jour de l’EIES a été préparée par les consultants d’ERM en 2018,...
10-aoû-2018

Multinational - Projet d’interconnexion des réseaux électriques Burundi – Rwanda – Résumé PAR

Le présent document résume le Plan complet de réinstallation (PCR) du Projet d’interconnexion électrique reliant le Rwanda (Kigoma-Butare) au Burundi (Ngozi-Gitega). L’interconnexion des réseaux électriques du Burundi et du Rwanda par le raccordement des localités de Gitega, Ngozi, Butare et Kigoma fait partie du projet multinational d’interconnexion des réseaux électriques des pays des lacs équatoriaux du Nil (PMIREL-PLEN ou NELSAP en anglais). La longueur totale prévue de la ligne de 110-220 kV est de 140,7 km, comprenant 61,5 km au Rwanda et 79,2 km au Burundi. Il est également prévu la...
30-juil-2018

Côte d’Ivoire – Libéria - Programme de développement routier et de facilitation du transport de l’union du fleuve mano (UFM/RDTFP) (Deuxième phase) relatif au tronçon Sanniquellie–Loguatuo – Résumé PAR

Le projet proposé porte sur la construction de la route reliant Sanniquellie à Loguatuo, à la frontière ivoirienne. Il sera réalisé le long de la route de terre qui existe déjà. La route Sanniquellie-Loguatuo couvre une distance estimée à 47,98 km. L’emprise du projet suivra principalement les routes non bitumées existantes et l’impact global devrait se faire sentir surtout sur la végétation et plusieurs cours d’eau le long du corridor.
27-juil-2018

Ouganda - Projet en PPP d’autoroute Kampala-Jinja – Résumé RAP

La Banque africaine de développement envisage d'appuyer financièrement la phase 1 du projet en PPP1 d’autoroute Kampala-Jinja (KJE), une voie rapide à péage et accès limité entre les régions du centre et de l'est de l'Ouganda, en Afrique de l'Est. Le projet global (en deux phases, 1 et 2) comprend la principale autoroute Kampala-Jinja qui reliera la capitale Kampala à la ville de Jinja à l'est, et la voie de contournement sud de Kampala (KSB) (voir la planche 1 en annexe au présent rapport).
27-juil-2018

Burundi/Tanzania - Rehabilitation of Bujumbura – Rumonge – Rutunga -Bujumbura Road Section – RDGE - RAP summary

The Rumonge - Bujumbura road section is one of the EAC roads under the Multi-National Tanzania/Burundi: Nyakanazi-Kasulu-Manyovu/Rumonge-Rutunga-Bujumbura Road Project. The Project objective is to rehabilitate and upgrade the existing Rumonge–Bujumbura road (78km) section to bituminous that conform to East African Community standards with the aim of enhancing trade, transport and tourism in the East African Region as well as improving socioeconomic conditions for the population along Lake Tanganyika.
27-juil-2018

Benin - Aménagement et bitumage de la route Djougou – Pehunco – Kerou -Banikoara – Résumé PAR

Le présent document constitue le résumé du Plan d’Action de Réinstallation (PAR) du projet d’aménagement et de bitumage de la route Djougou – Pehunco – Kerou –Banikoara en République du Bénin et qui s’étend sur 210 km. Du point de vue environnemental et social, le projet est classé dans la catégorie 1, au regard de la nature des travaux à entreprendre, de la taille et de l’envergure du projet, ainsi que de ses effets potentiels directs et indirects.
02-juil-2018

Zimbabwé - Projet de réhabilitation du réseau du nord-est – Résumé PAR

Le projet proposé consiste en la construction d’une ligne de transport unique de 132 kV du poste électrique 132/36 kV d’Atlanta à la ville de Mutoko. Le poste électrique actuel a assez d’espace pour abriter une nouvelle travée de ligne. La ligne de transport s’arrête au poste électrique 132/33 kV proposé au centre-ville de Mutoko. Le nouveau poste de 132 kV de Mutoko sera équipé de deux transformateurs de 30/50 MVA et de sept travées de ligne de 33 kV (une ligne de 36 kV de haute capacité sera construite à partir de Mutoko) et couvrira une aire d’impact d’environ 1,5 hectare. Une voie d’accès...
25-juin-2018

Malawi - Projet de construction d’un canal principal allant de la prise d’eau au parc national de lengwe au titre du programme de transformation de la vallée du Shire - Phase 1 – Résumé PAR

Le Programme de transformation de la vallée du Shire sera exécuté dans les districts de Chikwawa et Nsanje au Sud du Malawi. Il vise à contribuer à faire reculer la pauvreté grâce à l’accroissement de la valeur ajoutée et à la construction d’infrastructures en vue d’améliorer la productivité agricole et d’assurer l’adaptation aux changements climatiques. Le projet a une durée de sept années (2018-25), pour un coût total net de taxes et de droits de 155,93 millions d’UC. La Banque apporte la contribution suivante : i) un prêt FAD de 20 millions d’UC ; ii) un don FSN de 4,5 millions d’UC ; iii...
18-juin-2018

Burundi and Tanzania - Multinational: RN3: Rumonge – Rutunga -Bujumbura Section [77.6 km] and Kabingo-Kasulu-Manyovu [300.1 km] Road Upgrade Project – RAP Summary

Road transport plays a significant role in the socio-economic development of both Tanzania and Burundi and accounts for more than 90% of motorized freight and passenger traffic in the two countries. The significant part of both countries’ road networks form part of the East African Community (EAC) regional trunk road network and therefore serve as transit for exports and imports through the Dar-es-Salaam port for the land locked countries to the west, namely, Burundi, Eastern DRC, Rwanda and Uganda. As such the two countries have developed investment programs in the transport sector to...