Plans de gestion environnementale et sociale (PGES)

11-oct-2019

Zambia - The construction of the Mwami and the Katete electronic weighbridges along the great east road - Nacala Road Corridor Development Project – Phase IV Supplementary Financing - ESMP Summary

The Government of the Republic of Zambia has embarked upon a programme of rehabilitating the road infrastructure in the country. In 1997 the Government through the Zambia Road Development Agency (RDA) launched the Road Sector Investment Programme (ROADSIP) whose main objective was to bring all proposed roads under its mandate to maintainable and manageable levels to speed up socio-economic development at all levels in the country. Consequently, Government has upgraded and maintained a number of trunk, main and district roads in the country. Within the auspices of the ROADSIP, Government...
04-oct-2019

Nigeria - Urban Water Reform and Akure Water Supply and Sanitation Project - NUWSRP III - ESMP Summary

Nigeria is the most populous country in sub-Saharan Africa with between 180 and 200 million people. It is estimated that more than 30 % of Nigerians have no access to safe water. The Government of Nigeria has long recognized the challenges facing its water sector. This includes:  Increasing population, Increasing urbanization Low access to services, Failure of undermaintained infrastructure, Poor capacity and performance of service providers. Thus, since early 2000, Nigeria has worked on water sector reforms, supported by various donors. Projects to increase access to...
03-oct-2019

Nigeria - Support to health systems strenghtening for malaria elimination and nutrition improvement in Ondo State - PIU - Summary ESMP

Health is a key sector considered in the Federal Government of Nigeria’s most recent Medium–Term Development Economic Policy Thrust (2017 – 2020) articulated in its Economic Recovery and Growth Plan (ERGP). The Federal Government of Nigeria intends to invest in health and education to fill the skills gap in the economy and meet the international targets set under the United Nation’s Sustainable Development Goals (SDGs). As part of the ERGP, the FGN developed the support to National Program on Malaria Elimination and Nutrition Improvement Project. The ERGP will improve the accessibility,...
03-oct-2019

Nigeria - Support to health systems strengthening for malaria elimination and nutrition improvement in Anambra State - PIU - Summary ESMP

Health is a key sector considered in the Federal Government of Nigeria’s most recent Medium–Term Development Economic Policy Thrust (2017 – 2020) articulated in its Economic Recovery and Growth Plan (ERGP). The Federal Government of Nigeria intends to invest in health and education to fill the skills gap in the economy and meet the international targets set under the United Nation’s Sustainable Development Goals (SDGs). As part of the ERGP, the FGN developed the support to National Program on Malaria Elimination and Nutrition Improvement Project. The ERGP will improve the accessibility,...
30-sep-2019

Zambia - Sustainable Livestock Infrastructure Management Project’s (SLIMP) - Summary ESMP

The Zambian Government’s development agenda are articulated in the National Vision 2030 and the Seventh National Development Plan (7NDP: 2017-2021). The National Vision 2030 sets the long-term vision which reflects the understanding, aspirations and determination of the people to be a “prosperous middle-income country by 2030”. The main goal of 7NDP (2017-2021) is to create a diversified and resilient economy for sustained growth and socio economic transformation driven among others, by agriculture. The 7NDP departs from sectoral-based planning to an integrated (multi-sectoral) development...
26-aoû-2019

Ghana - Ghana Savannah Investment Programme - Summary ESMP

The Savanna Investment Programme is part of the Ghana Government’s agenda to ensure immediate and adequate availability of food in the country through improved productivity and intensification of targeted commodities; creation of job opportunities for the teeming unemployed youth in the agriculture and allied sectors; and setting up of agribusinesses. The Project is anchored in the Planting for Food and Jobs Campaign (PFJ) of the Ministry of Food and Agriculture as well as the One District One Factory (1D1F) initiative of the government of Ghana. The PFJ seeks to enhance agricultural...
09-aoû-2019

Togo - Projet d’Électrification Rurale CIZO – Rapport final CGES

Le projet d’électrification rurale « CIZO » (qui signifie allumer en langue « Guin ») couvre toute l’étendue du territoire Togolais et vise à l’horizon 2022, un accès à l’électricité par la fourniture des kits solaires individuels à coûts abordables à plus de 2 millions de citoyens (soit environ 300.000 foyers). Les sites de ce projet d’électrification rurale n’étant pas connus à cette phase du projet, il est indispensable d’élaborer un cadre de gestion pour permettre de prendre en charge les impacts environnementaux des investissements sur le milieu récepteur une fois que les sites seront...
09-aoû-2019

Togo - Projet d’Électrification Rurale CIZO – Résumé CGES

Le projet d’électrification rurale CIZO a été initié par le gouvernement de la République Togolaise et vise à l’horizon 2022, un accès à l’électricité par la fourniture des kits solaires individuels à coûts abordables à plus de 2 millions de citoyens (soit environ 300.000 foyers). Le projet prévoit dans sa composante sociale d’électrifier environ 800 centres de santé, d’équiper 1000 Adduction d’Eau Villageoises (AEV), 3000 petites exploitations agricoles en systèmes solaires individuels de pompage d’eau ou d’irrigation, et l’installation de 10 mini-réseaux utilisant des compteurs...
01-aoû-2019

Kenya - Projet d'appui à l'enseignement et à la formation techniques et professionnels et à l'entrepreneuriat - Résumé PGES

Le Plan de gestion environnementale et sociale (PGES) met l'accent sur l'atténuation des impacts identifiés lors de l'évaluation des impacts environnementaux et sociaux. Il s'agit d'un instrument qui permettra au ministère de l'Education, de la Science et de la Technologie, aux bénéficiaires du projet et aux autres parties prenantes clés d'intégrer les préoccupations environnementales et sociales au cours des différentes phases de la mise en œuvre du projet. Ce plan vise à établir des mesures et des procédures pour contrôler les impacts identifiés et suivre leur progression. À long terme, il...
03-juin-2019

Angola - Institutional and Sustainability Support to Urban Water Supply and Sanitation Service Delivery – P-AO-E00-005 - ESMP Summary

Angola’s 2025 vision identifies access to water supply and sanitation services for all Angolans as one of its goals. In this regard, improving water and sanitation coverage and service levels are included in the Water Sector Action Plan 2013-17 with an ambitious targets to revert the current situation where the majority of the urban and in particular the peri-urban population have limited access to these services. The objective is to reach 100% water and sanitation coverage in core urban areas by 2017 and these objectives support the Human Development Pillar in the National Development...
27-mai-2019

Lesotho - Lesotho EGovernment Infrastructure Phase II - ESMP Summary

The Government of the Kingdom of Lesotho and the Management of African Development Bank (AfDB) are proposing to implement a phase II of the Lesotho e-government Infrastructure Project. The objective of the Phase II project is to improve citizen access to reliable eServices particularly those citizens living in rural and un-served areas through expansion of digital infrastructure.
27-mai-2019

Tunisie - Projet de développement et de promotion des Filières Agricoles dans le Gouvernorat de Zaghouan (PDPFA-GZ) – Résumé PGES

A la demande des autorités Tunisiennes, le Groupe de la Banque Africaine de Développement va soutenir la mise en œuvre du Projet de développement et de promotion des Filières Agricoles dans le Gouvernorat de Zaghouan (PDPFA-GZ) en Tunisie. Sur la base du système de Sauvegarde Intégré de la Banque, du point de vue environnemental et social, le projet est classé dans la catégorie 2, compte tenu des impacts environnementaux et sociaux négatifs identifiés qui sont d’importance faible à moyenne. Conformément à la loi tunisienne, en matière de sauvegardes environnementale et social, une notice d’...
20-mai-2019

Soudan du Sud - Projet d’amélioration de la qualité et de l’accès à l’éducation de base - Résumé PGES

Le projet d’appui à l’éducation de base vise à améliorer la qualité de l’enseignement primaire au Soudan du Sud et en étendre l’accès à plus de 2,2 millions d’enfants non scolarisés. L’objectif est de favoriser un accès équitable à un enseignement de qualité par l’amélioration des infrastructures et de la formation des enseignants. La réhabilitation et l’agrandissement de 31 écoles primaires dans quatre anciens États (Haut Nil, Unity, Jonglei et Equatoria oriental) où le système éducatif a sérieusement pâti du conflit permettront de scolariser plus de 30 000 élèves, dont 30 % devraient...
17-mai-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PGES

Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du maintien du niveau de service entre Kinshasa/N’djili et Batshamba, afin de garantir la poursuite réelle de la réhabilitation progressive de la RN 1 qui relie Matadi à...
17-mai-2019

Multinational : Malindi - Lunga Lunga/Tanga - Bagamoyo Road Corridor Development – RAP Summary for the proposed upgrading of Mombasa - Mtwapa - Kwa Kadzengo - Kilifi (A7) Section , Kenya

The Government of the Republic of Kenya, through its implementing agency, the Kenya National Highways Authority (KeNHA) and support of the African Development Bank (AfDB) is undertaking review of the Mombasa-Mtwapa-Kadzengo-Kilifi (55 Km)Section of the A7 Highway which previously underwent Feasibility Study and Detailed Design as part of the Multi-national Lunga Lunga-Mombasa-Malindi (A7) Road Project. Towards this, KeNHA commissioned a consortium led by Uniconsult Engineering Consultants Ltd to undertake the Consultancy Service for Review of the Feasibility Study, Environmental and Social...
17-mai-2019

RDC - Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa/N’djili – Batshamba - Résumé PARA

Le présent document résume le Plan d’action de réinstallation abrège (PARA) du Projet de sauvegarde et de réhabilitation de la RN1 entre Kinshasa-N’Djili-Batshamba. Le projet de réhabilitation de la Route Nationale n°1 dans son tronçon Kinshasa-Batshamba s’étend du Pont de la Nsele (PK615+00) à Batshamba (PK1.238+00). Il est réalisé en République Démocratique du Congo (RDC), dans la zone économique centre retenue dans le cadre du Document de Stratégie Pays de la Banque. La sauvegarde et la réhabilitation de cette section de route bitumée s’inscrit dans le cadre de l’amélioration et du...
15-mai-2019

Multinational - RN3: Rumonge – Rutunga - Bujumbura Section [77.6 Km] and Kabingo-Kasulu-Manyovu [300.1 Km] Road Upgrade Project – ESMP Summary

The Government of United Republic of Tanzania has requested assistance from the African Development Bank (AfDB) to finance the upgrading of Nyakanazi – Kasulu – Manyovu road and its bypass roads to bituminous standard to conform to East African Community standards. Compliance with Government of Tanzania and the African Development Bank’s safeguard policy requires the following: i) the preparation of an Environmental and Social Impact Assessment (ESIA) report and an Environmental and Social Management Plan (ESMP) and ii) the preparation of Resettlement Action Plan. These activities are...
15-mai-2019

Multinational - RN3: Rumonge – Rutunga - Bujumbura Section [77.6 Km] and Kabingo-Kasulu-Manyovu [300.1 Km] Road Upgrade Project – ESMP Summary

The Government of United Republic of Tanzania has requested assistance from the African Development Bank (AfDB) to finance the upgrading of Nyakanazi – Kasulu – Manyovu road and its bypass roads to bituminous standard to conform to East African Community standards. Compliance with Government of Tanzania and the African Development Bank’s safeguard policy requires the following: i) the preparation of an Environmental and Social Impact Assessment (ESIA) report and an Environmental and Social Management Plan (ESMP) and ii) the preparation of Resettlement Action Plan. These activities are...
14-mai-2019

Guinée Équatoriale - Projet d’Appui au Développement des Chaînes de Valeurs du Secteur de la Pêche et de l’Aquaculture (PASPA) – Résumé PGES

Afin de réduire les effets de la forte dépendance au secteur pétrolier, le Gouvernement de la Guinée Equatoriale (GE) a opté pour la diversification des sources de croissance de son économie. Il envisage ainsi le développement du secteur de la pêche afin d’assurer l'autosuffisance du marché interne, et aussi dans le but de faire du pays un leader dans la fourniture de produits de pêche de la sous-région. En effet, en RGE le secteur de la pêche dispose d’une importante marge de progression et de valorisation pour impulser un processus de transformation structurelle de l’économie nationale, et...
14-mai-2019

Niger - Projet d’aménagement et de bitumage de la route Tamaske-Kalfou-Kolloma y compris la bretelle de Tamaske-Mararraba (63 Km) – Résumé PAR

Le présent document résume le Plan d’Action de Réinstallation du projet d’aménagement et de bitumage de la route Tamaské-Kalfou-Kolloma y compris la bretelle de Tamaské-Mararraba (63 km) dans la région de Tahoua. Ce projet s’inscrit dans le cadre du Programme de la Renaissance acte 2 du gouvernement de la République du Niger, à travers lequel un Plan de Développement Économique et Social (PDES) 2017-2021 a été élaboré et adopté le gouvernement. Ce PDES prend en compte les projets et programmes prévus par la Stratégie Nationale des Transports en vue de renforcer et préserver le réseau routier...